Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
7546 S CELINA WY
Apply Date:
02/21/2024
Applicant:
Kelly Rayman
Description:
Blackhawk H30A Model Plan

Permit Reviews

Permit Number - TC-MDP-0224-00233
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Start Date Submittal Complete Date Status  
07/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/15/2024 APPROVED Review Details
02/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/08/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0224-00233
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Total Outstanding Activity Conditions - 1
Date Name
02/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0224-00233
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Date Description Comments
07/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/15/2024 Post-Tension Inspection Report is required.
09/05/2023 Post-Tension Inspection Report is required.
02/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/15/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00233
Permit Description: Blackhawk H30A Model Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/01/2024 COT - RSPL - Rough Soil Passed
04/01/2024 COT - RSPL - Sewer Passed
04/01/2024 BULD - Electrical Clearance Passed
04/25/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/25/2024 COT - RSBU - Preslab Passed
04/25/2024 COT - RSEL - Electrical Underground Passed
04/25/2024 COT - RSEL - Grounding/Bonding Passed
05/09/2024 COT - RSBU - Roof Nailing Passed
05/10/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/06/2024 COT - RSPL - Gas Pressure Test Passed
06/06/2024 RSBU - Building Progress Passed
06/10/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/21/2024 COT - RSPL - Yard Water Line Passed
06/21/2024 COT - RSBU - Interior Shear Bracing Passed
08/08/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/8/2024
08/12/2024 COT - RSEL - Electrical Final Passed
08/12/2024 COT - RSEL - Outdoor Lighting Passed
08/12/2024 COT - RSME - Mechanical Final Passed
08/12/2024 COT - RSPL - Plumbing Final Passed
08/15/2024 ENGR Engineering Final Passed Move in ready
08/15/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
BHK 154 SIC-2024-07-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 154 D1_V1.PDF DOCUMENTS VIEW
BHK 154 SIC-2024-02-21_V1.PDF DOCUMENTS VIEW