Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
03/27/2024
Applicant:
Paul Corr
Description:
SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension

Permit Reviews

Permit Number - TC-MDP-0224-00223
Permit Status: Inspections complete
Permit Description: SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension
Start Date Submittal Complete Date Status  
03/28/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/04/2024 APPROVED Review Details
04/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/10/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0224-00223
Permit Status: Inspections complete
Permit Description: SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension
Total Outstanding Activity Conditions - 6
Date Name
02/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/01/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/01/2024 Post-Tension Inspection Report is required.
04/01/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0224-00223
Permit Status: Inspections complete
Permit Description: SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension
Date Description Comments
02/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/01/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00223
Permit Description: SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/30/2024 COT - RSPL - Rough Soil Passed
04/30/2024 COT - RSPL - Sewer Passed
04/30/2024 COT - RSPL - Yard Water Line Passed
05/08/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is properly installed per plans, additional rebar reinforcement is installed per plans, shear wall hold downs are in place, masa clips are in place, Ufer ground is installed on garage side footing, underground electrical for kitchen island is installed, and all underground slab plumbing pipes are properly wrapped for protection. Okay to pour concrete for footings and slab on grade.
05/08/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is properly installed per plans, additional rebar reinforcement is installed per plans, shear wall hold downs are in place, masa clips are in place, Ufer ground is installed on garage side footing, underground electrical for kitchen island is installed, and all underground slab plumbing pipes are properly wrapped for protection. Okay to pour concrete for footings and slab on grade.
05/08/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is properly installed per plans, additional rebar reinforcement is installed per plans, shear wall hold downs are in place, masa clips are in place, Ufer ground is installed on garage side footing, underground electrical for kitchen island is installed, and all underground slab plumbing pipes are properly wrapped for protection. Okay to pour concrete for footings and slab on grade.
05/08/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is properly installed per plans, additional rebar reinforcement is installed per plans, shear wall hold downs are in place, masa clips are in place, Ufer ground is installed on garage side footing, underground electrical for kitchen island is installed, and all underground slab plumbing pipes are properly wrapped for protection. Okay to pour concrete for footings and slab on grade.
05/29/2024 COT - RSBU - Roof Nailing Passed
05/31/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
07/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7/5/24: Mechanical, electrical, and plumbing rough-in are complete. Okay to install insulation and drywall.
07/05/2024 COT - RSPL - Gas Pressure Test Passed 7/5/24: Gas line is under 15# of air pressure with no leaks. Okay to proceed.
07/19/2024 COT - RSBU - Interior Shear Bracing Passed
08/21/2024 BULD - Electrical Clearance Passed Ground wire is properly installed to Ufer ground, all electrical wiring is properly installed, all breakers are properly installed in panel and panel dead front is properly labeled. Okay to energize system. ECO Clearance issued to TEP for 12746 E Huston Canyon Way.
09/10/2024 COT - BULD - SWG Clearance Passed SWG for meter only
10/03/2024 COT - RSEL - Outdoor Lighting Passed
10/03/2024 COT - RSME - Mechanical Final Passed
10/03/2024 ENGR Engineering Final Passed CO Ready
10/07/2024 RSBU - Building Progress Passed
10/07/2024 RSBU - Building Final Passed 10/7/24: clean outs have been cut down to grade. Panel is properly labeled. Okay to issue Certificate of Occupancy.
10/07/2024 COT - RSPL - Plumbing Final Passed 10/7/24: clean outs have been cut down to grade. Okay to issue Certificate of Occupancy.
10/07/2024 COT - RSEL - Electrical Final Passed 10/7/24: clean outs have been cut down to grade. Panel is properly labeled. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
K35O APPROVED TRUSS CALCS 9-29-22 - ALLIANCE TRUSS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-03-27_V1.PDF DOCUMENTS VIEW