Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0224-00218
Permit Details
Apply Date:
04/10/2024
Applicant:
Dana Petty
Description:
SFR MER1502320 T21-M0070 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0224-00218
Permit Status: Issued
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/18/2024 | APPROVED |
08/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/23/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0224-00218
Permit Status: Issued
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
02/14/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0224-00218
Permit Status: Issued
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Date | Description | Comments |
---|---|---|
04/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
04/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/15/2024 | Post-Tension Inspection Report is required. | |
02/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0224-00218
Permite Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
COT - BULD - SWG Clearance | N/A | Scheduled |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0224-00218
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/21/2024 | COT - RSPL - Rough Soil | Passed | ||
06/21/2024 | COT - RSPL - Sewer | Passed | ||
06/21/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/28/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is evenly spaced and correctly installed, underground plumbing is properly wrapped with foam, underground electrical for kitchen island is installed, additional rebar reinforcement is properly installed per plan, and Ufer ground is installed in footing. Okay to proceed with pouring concrete. | |
06/28/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is evenly spaced and correctly installed, underground plumbing is properly wrapped with foam, underground electrical for kitchen island is installed, additional rebar reinforcement is properly installed per plan, and Ufer ground is installed in footing. Okay to proceed with pouring concrete. | |
06/28/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is evenly spaced and correctly installed, underground plumbing is properly wrapped with foam, underground electrical for kitchen island is installed, additional rebar reinforcement is properly installed per plan, and Ufer ground is installed in footing. Okay to proceed with pouring concrete. | |
06/28/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is evenly spaced and correctly installed, underground plumbing is properly wrapped with foam, underground electrical for kitchen island is installed, additional rebar reinforcement is properly installed per plan, and Ufer ground is installed in footing. Okay to proceed with pouring concrete. | |
07/22/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior and interior plywood shear walls are properly installed, bolted, and nailed per the plans. All masa clips are properly nailed to bottom plate, all shear wall hold downs are properly nailed to wall studs, and titan bolts are installed were joints in bottom plate happened. Okay to proceed with rough-in of mechanical, electrical, and plumbing. | |
07/22/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly installed and secured to the top plate with nails and H2.5 clips. Roof sheathing is properly secured to the roof trusses with nails and staples. | |
08/19/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
08/19/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/20/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
09/03/2024 | COT - RSBU - Interior Shear Bracing | Passed |
Scheduled Inspections
Scheduled Inspections - TC-MDP-0224-00218
Status: Issued
Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
10/23/2024 | COT - BULD - SWG Clearance | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.