Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
04/10/2024
Applicant:
Daria Hopkins
Description:
SFR MER1502320 T21-M0070 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0224-00218
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Start Date Submittal Complete Date Status  
04/12/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/18/2024 APPROVED Review Details
08/23/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/23/2024 APPROVED Review Details
11/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0224-00218
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Date Description Comments
04/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/15/2024 Post-Tension Inspection Report is required.
02/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0224-00218
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/21/2024 COT - RSPL - Rough Soil Passed
06/21/2024 COT - RSPL - Sewer Passed
06/21/2024 COT - RSPL - Yard Water Line Passed
06/28/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is evenly spaced and correctly installed, underground plumbing is properly wrapped with foam, underground electrical for kitchen island is installed, additional rebar reinforcement is properly installed per plan, and Ufer ground is installed in footing. Okay to proceed with pouring concrete.
06/28/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is evenly spaced and correctly installed, underground plumbing is properly wrapped with foam, underground electrical for kitchen island is installed, additional rebar reinforcement is properly installed per plan, and Ufer ground is installed in footing. Okay to proceed with pouring concrete.
06/28/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is evenly spaced and correctly installed, underground plumbing is properly wrapped with foam, underground electrical for kitchen island is installed, additional rebar reinforcement is properly installed per plan, and Ufer ground is installed in footing. Okay to proceed with pouring concrete.
06/28/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is evenly spaced and correctly installed, underground plumbing is properly wrapped with foam, underground electrical for kitchen island is installed, additional rebar reinforcement is properly installed per plan, and Ufer ground is installed in footing. Okay to proceed with pouring concrete.
07/22/2024 COT - RSBU - Exterior Clips/Sheathing Passed Exterior and interior plywood shear walls are properly installed, bolted, and nailed per the plans. All masa clips are properly nailed to bottom plate, all shear wall hold downs are properly nailed to wall studs, and titan bolts are installed were joints in bottom plate happened. Okay to proceed with rough-in of mechanical, electrical, and plumbing.
07/22/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly installed and secured to the top plate with nails and H2.5 clips. Roof sheathing is properly secured to the roof trusses with nails and staples.
08/19/2024 BULD - Electrical Clearance Passed TEP ECO
08/19/2024 COT - RSPL - Gas Pressure Test Passed
08/20/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/03/2024 COT - RSBU - Interior Shear Bracing Passed
10/23/2024 COT - BULD - SWG Clearance Passed 10/23/24:SWG clearance ok for meter tag
10/29/2024 COT - RSEL - Electrical Final Passed
10/29/2024 COT - RSEL - Outdoor Lighting Passed
10/29/2024 COT - RSME - Mechanical Final Passed
10/29/2024 COT - RSPL - Plumbing Final Passed
10/29/2024 ENGR Engineering Final Passed
10/29/2024 RSBU - Building Final Passed
10/29/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
148587 PT LOT 65 COMPLETE-2024-08-20_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 65 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 65 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 65 SPECIAL INSPECTION CERTIFICATE-2024-04-10_V1.PDF DOCUMENTS VIEW