SFR MER1502320 T21-M0070 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0224-00217
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/19/2024 | APPROVED |
03/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/18/2024 | REQUIRES RESUBMIT |
03/18/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 03/22/2024 | APPROVED |
11/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/22/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0224-00217
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Date | Description | Comments |
---|---|---|
03/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
03/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/15/2024 | Post-Tension Inspection Report is required. | |
02/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/14/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
07/19/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
03/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00217
Permite Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/16/2024 | RSBU - Building Progress | N/A | Not Applicable | |
10/16/2024 | ENGR Engineering Final | N/A | Not Ready | contractor needs to remove all the dirt piles all the construction material on the side of the yard and in the backyard all the construction material needs to be removed complete the wall for the gate on the south east side needs to be completed and hang both gates |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00217
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/22/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing and sewer line are connected and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches. | |
05/22/2024 | COT - RSPL - Yard Water Line | Passed | Water line is connected to the main water meter and is under street pressure. Blue tracer wire is installed from meter to house. Okay to shade pipe and backfill trench. | |
05/22/2024 | COT - RSPL - Sewer | Passed | Underground plumbing and sewer line are connected and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches. | |
06/07/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/07/2024 | COT - RSBU - Preslab | Passed | ||
06/07/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
06/07/2024 | COT - RSEL - Electrical Underground | Passed | ||
06/26/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Shear hold downs are properly bolted and nailed to shear walls, base plates are properly secured to floor with cut nails, titan bolts or j-bolts poured into concrete. Okay to proceed with rough-in of mechanical, electrical, and plumbing. | |
06/26/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is stapled to roof trusses per plan and code requirements. Okay to proceed with top out of plumbing and rough-in of mechanical and electrical. | |
07/25/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
07/25/2024 | BULD - Electrical Clearance | Passed | TEP eco | |
07/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/07/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall installed on interior shear walls is properly secured to studs per plan requirements for shear walls. Okay to proceed with tape, texture, and paint. | |
09/23/2024 | COT - BULD - SWG Clearance | Passed | Passed SW gas clearance 9/23/23 | |
10/16/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
10/16/2024 | COT - RSME - Mechanical Final | Passed | ||
10/16/2024 | COT - RSPL - Plumbing Final | Passed | ||
10/16/2024 | RSBU - Building Final | Passed | ||
11/06/2024 | ENGR Engineering Final | Passed | ||
11/12/2024 | COT - RSEL - Electrical Final | Passed | 11-12-25, listed items from previous inspection corrected. Electrical final approved. |