Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
03/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER1502320 T21-M0070 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0224-00217
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Start Date Submittal Complete Date Status  
07/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/19/2024 APPROVED Review Details
03/05/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/18/2024 REQUIRES RESUBMIT Review Details
03/18/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 03/22/2024 APPROVED Review Details
11/22/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/22/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0224-00217
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Date Description Comments
03/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/15/2024 Post-Tension Inspection Report is required.
02/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/19/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0224-00217
Permite Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/16/2024 RSBU - Building Progress N/A Not Applicable
10/16/2024 ENGR Engineering Final N/A Not Ready contractor needs to remove all the dirt piles all the construction material on the side of the yard and in the backyard all the construction material needs to be removed complete the wall for the gate on the south east side needs to be completed and hang both gates

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0224-00217
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Completed Inspections - 20
Date Description Inspector Results Comments
05/22/2024 COT - RSPL - Rough Soil Passed Underground plumbing and sewer line are connected and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches.
05/22/2024 COT - RSPL - Yard Water Line Passed Water line is connected to the main water meter and is under street pressure. Blue tracer wire is installed from meter to house. Okay to shade pipe and backfill trench.
05/22/2024 COT - RSPL - Sewer Passed Underground plumbing and sewer line are connected and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches.
06/07/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/07/2024 COT - RSBU - Preslab Passed
06/07/2024 COT - RSEL - Grounding/Bonding Passed
06/07/2024 COT - RSEL - Electrical Underground Passed
06/26/2024 COT - RSBU - Exterior Clips/Sheathing Passed Shear hold downs are properly bolted and nailed to shear walls, base plates are properly secured to floor with cut nails, titan bolts or j-bolts poured into concrete. Okay to proceed with rough-in of mechanical, electrical, and plumbing.
06/26/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is stapled to roof trusses per plan and code requirements. Okay to proceed with top out of plumbing and rough-in of mechanical and electrical.
07/25/2024 COT - RSPL - Gas Pressure Test Passed
07/25/2024 BULD - Electrical Clearance Passed TEP eco
07/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/07/2024 COT - RSBU - Interior Shear Bracing Passed Drywall installed on interior shear walls is properly secured to studs per plan requirements for shear walls. Okay to proceed with tape, texture, and paint.
09/23/2024 COT - BULD - SWG Clearance Passed Passed SW gas clearance 9/23/23
10/16/2024 COT - RSEL - Outdoor Lighting Passed
10/16/2024 COT - RSME - Mechanical Final Passed
10/16/2024 COT - RSPL - Plumbing Final Passed
10/16/2024 RSBU - Building Final Passed
11/06/2024 ENGR Engineering Final Passed
11/12/2024 COT - RSEL - Electrical Final Passed 11-12-25, listed items from previous inspection corrected. Electrical final approved.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
148065 PT LOT 71 COMPLETE-2024-07-18_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 71 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 71 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 71 SPECIAL INSPECTION CERTIFICATE-2024-03-05_V1.PDF DOCUMENTS VIEW