Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/14/2024
Applicant:
Daria Hopkins
Description:
SFR MER1502320 T21-M0070 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0224-00216
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Start Date Submittal Complete Date Status  
03/18/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 03/22/2024 APPROVED Review Details
03/05/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/18/2024 REQUIRES RESUBMIT Review Details
08/23/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/23/2024 APPROVED Review Details
11/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/18/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0224-00216
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Date Description Comments
03/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/15/2024 Post-Tension Inspection Report is required.
02/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0224-00216
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/21/2024 COT - RSPL - Yard Water Line Passed
06/21/2024 COT - RSPL - Sewer Passed
06/21/2024 COT - RSPL - Rough Soil Passed
07/03/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab.
07/03/2024 COT - RSBU - Preslab Passed Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab.
07/03/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab.
07/03/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab.
07/25/2024 COT - RSBU - Roof Nailing Passed
07/29/2024 COT - RSBU - Exterior Clips/Sheathing Passed 7/29/24: Anchor bolts have been installed at locations where masa clips have one leg nailed to the bottom plate and the other leg nailed to a stud and titan bolts have been installed at shear walls. Stud has been added underneath girder in front room. Missing RSP clips have been installed on south side of house.
08/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/15/2024 BULD - Electrical Clearance Passed
08/15/2024 COT - RSPL - Gas Pressure Test Passed
08/15/2024 RSBU - Building Progress Passed
08/28/2024 COT - RSBU - Interior Shear Bracing Passed Drywall is properly secured to studs per plan for a sheet rock interior shear wall. Okay to proceed with tape, texture, and paint.
10/10/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 10/10/2024
11/08/2024 COT - RSEL - Electrical Final Passed Construction is completed per plans. Okay to issue Certificate of Occupancy.
11/08/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is properly installed per plan and city requirements/guidelines.
11/07/2024 COT - RSME - Mechanical Final Passed
11/08/2024 COT - RSPL - Plumbing Final Passed Construction is completed per plans. Okay to issue Certificate of Occupancy.
11/08/2024 RSBU - Building Final Passed Construction is completed per plans. Okay to issue Certificate of Occupancy.
11/13/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
148585 PT LOT 70 COMPLETE-2024-08-20_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 70 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 70 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 70 SPECIAL INSPECTION CERTIFICATE-2024-03-05_V1.PDF DOCUMENTS VIEW