Permit: TC-MDP-0224-00216
Permit Details
Apply Date:
02/14/2024
Applicant:
Daria Hopkins
Description:
SFR MER1502320 T21-M0070 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0224-00216
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/18/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 03/22/2024 | APPROVED |
03/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/18/2024 | REQUIRES RESUBMIT |
08/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/23/2024 | APPROVED |
11/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/18/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0224-00216
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Date | Description | Comments |
---|---|---|
03/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
03/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/15/2024 | Post-Tension Inspection Report is required. | |
02/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/14/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
03/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00216
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/21/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/21/2024 | COT - RSPL - Sewer | Passed | ||
06/21/2024 | COT - RSPL - Rough Soil | Passed | ||
07/03/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab. | |
07/03/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab. | |
07/03/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab. | |
07/03/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set in place, post tension cabling is evenly spaced throughout slab per plans, shear wall hold downs are properly secured to form in the proper location per plans, masa clips are properly spaced and secured to form edges, additional rebar reinforcement is placed were plans call for it, Ufer ground is located in the bottom of footer, all underground plumbing pipes are properly wrapped with foam, and underground electrical conduit is installed for kitchen island. 3rd party inspection has been conducted and passed. Okay to pour concrete for footings and slab. | |
07/25/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/29/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 7/29/24: Anchor bolts have been installed at locations where masa clips have one leg nailed to the bottom plate and the other leg nailed to a stud and titan bolts have been installed at shear walls. Stud has been added underneath girder in front room. Missing RSP clips have been installed on south side of house. | |
08/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/15/2024 | BULD - Electrical Clearance | Passed | ||
08/15/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/15/2024 | RSBU - Building Progress | Passed | ||
08/28/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall is properly secured to studs per plan for a sheet rock interior shear wall. Okay to proceed with tape, texture, and paint. | |
10/10/2024 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 10/10/2024 | |
11/08/2024 | COT - RSEL - Electrical Final | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
11/08/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed per plan and city requirements/guidelines. | |
11/07/2024 | COT - RSME - Mechanical Final | Passed | ||
11/08/2024 | COT - RSPL - Plumbing Final | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
11/08/2024 | RSBU - Building Final | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
11/13/2024 | ENGR Engineering Final | Passed |