Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
7410 S KELLER LN
Apply Date:
02/08/2024
Applicant:
Joshua Swinney
Description:
Black Mountain model SFR Escalara

Permit Reviews

Permit Number - TC-MDP-0224-00197
Permit Status: Inspections complete
Permit Description: Black Mountain model SFR Escalara
Start Date Submittal Complete Date Status  
10/21/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/21/2024 APPROVED Review Details
02/08/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/26/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0224-00197
Permit Status: Inspections complete
Permit Description: Black Mountain model SFR Escalara
Date Description Comments
02/26/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/08/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/20/2023 Post-Tension Inspection Report is required.
10/21/2024 Post-Tension Inspection Report is required.
02/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/12/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/12/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
02/08/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
04/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00197
Permite Description: Black Mountain model SFR Escalara
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
08/06/2024 COT - BULD - SWG Clearance N/A Not Applicable
08/06/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00197
Permit Description: Black Mountain model SFR Escalara
Total Completed Inspections - 20
Date Description Inspector Results Comments
04/19/2024 COT - RSPL - Backwater Valve Passed
04/19/2024 COT - RSPL - Rough Soil Passed
04/19/2024 COT - RSPL - Yard Water Line Passed
05/03/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is installed per plans, rebar reinforcement is in place per plans, shear wall straps are installed per plans, masa clips are installed and spaced properly on forms, all plumbing pipes are properly wrapped for protection, and Ufer ground is installed on garage side of house. Okay to pour concrete for footings and slab.
05/03/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is installed per plans, rebar reinforcement is in place per plans, shear wall straps are installed per plans, masa clips are installed and spaced properly on forms, all plumbing pipes are properly wrapped for protection, and Ufer ground is installed on garage side of house. Okay to pour concrete for footings and slab.
05/03/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is installed per plans, rebar reinforcement is in place per plans, shear wall straps are installed per plans, masa clips are installed and spaced properly on forms, all plumbing pipes are properly wrapped for protection, and Ufer ground is installed on garage side of house. Okay to pour concrete for footings and slab.
05/03/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is installed per plans, rebar reinforcement is in place per plans, shear wall straps are installed per plans, masa clips are installed and spaced properly on forms, all plumbing pipes are properly wrapped for protection, and Ufer ground is installed on garage side of house. Okay to pour concrete for footings and slab.
06/07/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/07/2024 COT - RSBU - Roof Nailing Passed
08/13/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8/13/2024. Corrections were made.
08/23/2024 COT - RSBU - Interior Shear Bracing Passed Drywall is properly installed and screwed to studs per the plan requirements for an interior shear braced walls.
09/17/2024 COT - RSPL - Sewer Passed
09/17/2024 RSBU - Building Progress Passed 9/17/24: 18 inches of copper top and bottom before sweat joint outside of wall main water line
10/30/2024 BULD - Electrical Clearance Passed 10-30-24, panel approved for power.
11/21/2024 COT - RSEL - Electrical Final Passed 11-21-24, mechanical, electrical, outdoor lighting, plumbing and building final approved.
11/21/2024 COT - RSEL - Outdoor Lighting Passed 11-21-24, mechanical, electrical, outdoor lighting, plumbing and building final approved.
11/21/2024 COT - RSME - Mechanical Final Passed 11-21-24, mechanical, electrical, outdoor lighting, plumbing and building final approved.
11/21/2024 COT - RSPL - Plumbing Final Passed 11-21-24, mechanical, electrical, outdoor lighting, plumbing and building final approved.
11/21/2024 ENGR Engineering Final Passed Replace DG now sidewalk forms are removed.
11/21/2024 RSBU - Building Final Passed 11-21-24, mechanical, electrical, outdoor lighting, plumbing and building final approved.

Documents

File Name Document Type  
LOT 105 SIC-2024-10-15_V1.PDF DOCUMENTS VIEW
Z170 BLACK MOUNTAIN- TRUSS REVIEW LETTER - LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 105 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 105 SIC-2024-02-08_V1.PDF DOCUMENTS VIEW