SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0224-00190
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/26/2024 | APPROVED |
02/08/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/15/2024 | APPROVED |
06/28/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/01/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0224-00190
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
02/08/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
02/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
02/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/15/2024 | Post-Tension Inspection Report is required. | |
02/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/06/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/12/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00190
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/30/2024 | COT - RSPL - Yard Water Line | Passed | ||
04/30/2024 | COT - RSPL - Sewer | Passed | ||
04/30/2024 | COT - RSPL - Rough Soil | Passed | ||
05/15/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
05/15/2024 | COT - RSBU - Preslab | Passed | ||
05/15/2024 | COT - RSEL - Electrical Underground | Passed | ||
05/15/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
06/03/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly installed per truss calc's and are nailed to the top plate with nails and H2.5 clips. Plywood sheathing is properly nailed to trusses. | |
06/03/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Shear wall sheathing is properly installed and nailed per plans, wall bottom plate is nailed, shot pinned, bolted, or a/b bolted to the concrete floor. Shear wall hold downs are properly nailed to the wall, and masa clips are properly installed and nailed to bottom plate. | |
06/28/2024 | BULD - Electrical Clearance | Passed | TEP ECO Clearance issued. | |
06/28/2024 | COT - RSPL - Backwater Valve | Passed | ||
06/28/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15# of air pressure with no leaks. Okay to proceed. | |
06/28/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
07/24/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
09/05/2024 | COT - BULD - SWG Clearance | Passed | ||
09/20/2024 | COT - RSEL - Electrical Final | Passed | passed 9/20/2024 | |
09/20/2024 | COT - RSEL - Outdoor Lighting | Passed | passed 9/20/2024 | |
09/20/2024 | COT - RSME - Mechanical Final | Passed | passed 9/20/2024 | |
09/20/2024 | COT - RSPL - Plumbing Final | Passed | passed 9/20/2024 | |
09/20/2024 | ENGR Engineering Final | Passed | ||
09/20/2024 | RSBU - Building Final | Passed | passed 9/20/2024 | |
09/20/2024 | RSBU - Building Progress | Passed |