Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0224-00187
Permit Details
Apply Date:
02/13/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0224-00187
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/31/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/01/2024 | APPROVED |
02/14/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/26/2024 | APPROVED |
06/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/21/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0224-00187
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
02/14/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
02/14/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
02/14/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/16/2024 | Post-Tension Inspection Report is required. | |
02/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/06/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/12/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/21/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
02/16/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00187
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/03/2024 | RSBU - Building Progress | N/A | Canceled | 9/3/24: canceled per contractor |
09/03/2024 | COT - RSEL - Electrical Final | N/A | Canceled | 9/3/24: canceled per contractor |
09/03/2024 | COT - RSEL - Outdoor Lighting | N/A | Canceled | 9/3/24: canceled per contractor |
09/03/2024 | COT - RSME - Mechanical Final | N/A | Canceled | 9/3/24: canceled per contractor |
09/03/2024 | COT - RSPL - Plumbing Final | N/A | Canceled | 9/3/24: canceled per contractor |
09/03/2024 | RSBU - Building Final | N/A | Canceled | 9/3/24: canceled per contractor |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00187
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/26/2024 | COT - RSPL - Sewer | Passed | ||
04/26/2024 | COT - RSPL - Rough Soil | Passed | ||
04/26/2024 | COT - RSPL - Backwater Valve | Passed | ||
04/26/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/08/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
05/08/2024 | COT - RSBU - Preslab | Passed | ||
05/08/2024 | COT - RSEL - Electrical Underground | Passed | ||
05/08/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
05/23/2024 | COT - RSBU - Roof Nailing | Passed | ||
05/29/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 5/29/24: Cut nails have been installed in bottom plate at hallway from garage. | |
06/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
06/21/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
07/15/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/21/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
09/05/2024 | RSBU - Building Progress | Passed | ||
09/05/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
09/09/2024 | COT - RSEL - Electrical Final | Passed | 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy. | |
09/09/2024 | COT - RSEL - Outdoor Lighting | Passed | 9/9/24: Outdoor lighting is fully operational and installed per plans and city regulations. | |
09/09/2024 | COT - RSME - Mechanical Final | Passed | 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy. | |
09/09/2024 | COT - RSPL - Plumbing Final | Passed | 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy. | |
09/09/2024 | RSBU - Building Final | Passed | 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy. | |
09/09/2024 | ENGR Engineering Final | Passed |