Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
03/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0224-00185
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date Submittal Complete Date Status  
07/02/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/02/2024 APPROVED Review Details
03/05/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/15/2024 APPROVED Review Details
09/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/27/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0224-00185
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date Description Comments
03/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/15/2024 Post-Tension Inspection Report is required.
02/06/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/06/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/02/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0224-00185
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/15/2024 COT - RSPL - Backwater Valve Passed
05/15/2024 COT - RSPL - Rough Soil Passed
05/15/2024 COT - RSPL - Yard Water Line Passed
05/15/2024 COT - RSPL - Sewer Passed
05/29/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party, Ufer ground is installed on garage wall side of house, underground electrical is installed for kitchen island, masa clips and shear wall hold downs are properly secured to form at plan location, and all plumbing pipes are properly wrapped to protect from damage.
05/29/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party, Ufer ground is installed on garage wall side of house, underground electrical is installed for kitchen island, masa clips and shear wall hold downs are properly secured to form at plan location, and all plumbing pipes are properly wrapped to protect from damage.
05/29/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party, Ufer ground is installed on garage wall side of house, underground electrical is installed for kitchen island, masa clips and shear wall hold downs are properly secured to form at plan location, and all plumbing pipes are properly wrapped to protect from damage.
05/29/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party, Ufer ground is installed on garage wall side of house, underground electrical is installed for kitchen island, masa clips and shear wall hold downs are properly secured to form at plan location, and all plumbing pipes are properly wrapped to protect from damage.
06/11/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/11/2024 COT - RSBU - Roof Nailing Passed
07/08/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/08/2024 COT - RSPL - Gas Pressure Test Passed
07/26/2024 COT - RSBU - Interior Shear Bracing Passed
08/16/2024 BULD - Electrical Clearance Passed
09/11/2024 COT - BULD - SWG Clearance Passed
09/20/2024 COT - RSEL - Outdoor Lighting Passed passed 9/20/2024
09/20/2024 RSBU - Building Progress Passed passed 9/20/2024
09/20/2024 COT - RSEL - Electrical Final Passed passed 9/20/2024
09/20/2024 COT - RSME - Mechanical Final Passed passed 9/20/2024
09/20/2024 COT - RSPL - Plumbing Final Passed
09/20/2024 ENGR Engineering Final Passed
09/20/2024 RSBU - Building Final Passed passed 9/20/2024

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
147859 PT LOT 201 COMPLETE-2024-07-02_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 201 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 201 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 201 SPECIAL INSPECTION CERTIFICATE-2024-03-05_V1.PDF DOCUMENTS VIEW