Permit: TC-MDP-0224-00185
Permit Details
Apply Date:
03/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0224-00185
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/02/2024 | APPROVED |
03/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/15/2024 | APPROVED |
09/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/27/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0224-00185
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
03/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
03/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/15/2024 | Post-Tension Inspection Report is required. | |
02/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/06/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
07/02/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
03/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00185
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/15/2024 | COT - RSPL - Backwater Valve | Passed | ||
05/15/2024 | COT - RSPL - Rough Soil | Passed | ||
05/15/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/15/2024 | COT - RSPL - Sewer | Passed | ||
05/29/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party, Ufer ground is installed on garage wall side of house, underground electrical is installed for kitchen island, masa clips and shear wall hold downs are properly secured to form at plan location, and all plumbing pipes are properly wrapped to protect from damage. | |
05/29/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party, Ufer ground is installed on garage wall side of house, underground electrical is installed for kitchen island, masa clips and shear wall hold downs are properly secured to form at plan location, and all plumbing pipes are properly wrapped to protect from damage. | |
05/29/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party, Ufer ground is installed on garage wall side of house, underground electrical is installed for kitchen island, masa clips and shear wall hold downs are properly secured to form at plan location, and all plumbing pipes are properly wrapped to protect from damage. | |
05/29/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party, Ufer ground is installed on garage wall side of house, underground electrical is installed for kitchen island, masa clips and shear wall hold downs are properly secured to form at plan location, and all plumbing pipes are properly wrapped to protect from damage. | |
06/11/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/11/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/08/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/08/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
07/26/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/16/2024 | BULD - Electrical Clearance | Passed | ||
09/11/2024 | COT - BULD - SWG Clearance | Passed | ||
09/20/2024 | COT - RSEL - Outdoor Lighting | Passed | passed 9/20/2024 | |
09/20/2024 | RSBU - Building Progress | Passed | passed 9/20/2024 | |
09/20/2024 | COT - RSEL - Electrical Final | Passed | passed 9/20/2024 | |
09/20/2024 | COT - RSME - Mechanical Final | Passed | passed 9/20/2024 | |
09/20/2024 | COT - RSPL - Plumbing Final | Passed | ||
09/20/2024 | ENGR Engineering Final | Passed | ||
09/20/2024 | RSBU - Building Final | Passed | passed 9/20/2024 |