Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
05/30/2024
Applicant:
Dana Petty
Description:
SFR 130.1600 T21-M0030

Permit Reviews

Permit Number - TC-MDP-0224-00183
Permit Status: Issued
Permit Description: SFR 130.1600 T21-M0030
Start Date Submittal Complete Date Status  
05/31/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/04/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0224-00183
Permit Status: Issued
Permit Description: SFR 130.1600 T21-M0030
Total Outstanding Activity Conditions - 3
Date Name
02/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/31/2024 Post-Installed Anchor Inspection Report is required.
05/31/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0224-00183
Permit Status: Issued
Permit Description: SFR 130.1600 T21-M0030
Date Description Comments
02/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0224-00183
Permite Description: SFR 130.1600 T21-M0030
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
08/23/2024 COT - RSPL - Rough Soil N/A Re-inspection required 8/22/24: stack must be under pressure at 5' of static pressure.
8/23/24: stack must be under 5' of static pressure
08/23/2024 COT - RSPL - Sewer N/A Re-inspection required 8/22/24: stack must be under pressure at 5' of static pressure.
8/23/24: stack must be under 5' of static pressure
10/07/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Add nail plate to the back of dryer vent. Secure A/c disconnect. Caulk exterior penetrations. 10/7/2024

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0224-00183
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 11
Date Description Inspector Results Comments
08/22/2024 COT - RSPL - Yard Water Line Passed 8/22/24: Main water line per plans ok to proceed with backfill.shading required
08/23/2024 COT - RSPL - Rough Soil Passed 8/22/24: stack must be under pressure at 5' of static pressure.
8/23/24: stack must be under 5' of static pressure
8/23/24: corrections made. Ok to backfill shading required
08/23/2024 COT - RSPL - Sewer Passed 8/22/24: stack must be under pressure at 5' of static pressure.
8/23/24: stack must be under 5' of static pressure
8/23/24: corrections made.
08/29/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/29/2024 COT - RSBU - Preslab Passed
08/29/2024 COT - RSEL - Electrical Underground Passed
08/29/2024 COT - RSEL - Grounding/Bonding Passed
09/09/2024 COT - RSBU - Roof Nailing Passed
09/11/2024 COT - RSBU - Exterior Clips/Sheathing Passed
10/07/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 10/7/2024
10/07/2024 COT - RSPL - Gas Pressure Test Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 52 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 52 SPECIAL INSPECTION CERTIFICATE-2024-05-30_V1.PDF DOCUMENTS VIEW