SFR 130.1600 T21-M0030
Permit Reviews
Permit Number - TC-MDP-0224-00182
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/14/2024 | APPROVED |
11/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/18/2024 | APPROVED |
02/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/13/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0224-00182
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
Date | Description | Comments |
---|---|---|
02/05/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
02/05/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/13/2024 | Post-Tension Inspection Report is required. | |
02/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/13/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00182
Permite Description: SFR 130.1600 T21-M0030
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/22/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Partial Pass | 7/22/2024 Htt4 and 5 not fastened to bottom plate or nailed to studs. |
10/17/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | Missing lights near garage, garage clean out needs to be capped off, add strap to ac unit conduit, external pvc must be painted post tension tag needed on hose stand, hose receptacle missing, water shut off, Back porch lighting missing |
10/17/2024 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | Missing lights near garage, garage clean out needs to be capped off, add strap to ac unit conduit, external pvc must be painted post tension tag needed on hose stand, hose receptacle missing, water shut off, Bach porch lighting missing |
10/17/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Missing lights near garage, garage clean out needs to be capped off, add strap to ac unit conduit, external pvc must be painted post tension tag needed on hose stand, hose receptacle missing, water shut off, Back porch lighting missing |
10/17/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | Missing lights near garage, garage clean out needs to be capped off, add strap to ac unit conduit, external pvc must be painted post tension tag needed on hose stand, hose receptacle missing, water shut off, Back porch lighting missing |
10/17/2024 | RSBU - Building Final | N/A | Re-inspection required | Missing lights near garage, garage clean out needs to be capped off, add strap to ac unit conduit, external pvc must be painted post tension tag needed on hose stand, hose receptacle missing, water shut off, Back porch lighting missing |
10/17/2024 | RSBU - Building Progress | N/A | Re-inspection required | Missing lights near garage, garage clean out needs to be capped off, add strap to ac unit conduit, external pvc must be painted post tension tag needed on hose stand, hose receptacle missing, water shut off, Back porch lighting missing |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00182
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/24/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading is required. 6/24/2024 | |
06/24/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading is required. 6/24/2024 | |
06/24/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading is required. 6/24/2024 | |
07/02/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/02/2024 | COT - RSBU - Preslab | Passed | ||
07/02/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/02/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/19/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/23/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 7/23/2024. Corrections were made. | |
08/13/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 9/13/2024 | |
08/19/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 8/21/2024 | |
09/04/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/16/2024 | COT - BULD - SWG Clearance | Passed | 10/16/24: SWG Clearance ok for meter tag | |
10/17/2024 | ENGR Engineering Final | Passed | CO Ready | |
10/28/2024 | COT - RSEL - Electrical Final | Passed | 10-28-24-all previously noted items from recent inspections have been corrected. Building final approved. | |
10/28/2024 | COT - RSEL - Outdoor Lighting | Passed | 10-28-24-all previously noted items from recent inspections have been corrected. Building final approved. | |
10/28/2024 | COT - RSME - Mechanical Final | Passed | 10-28-24-all previously noted items from recent inspections have been corrected. Building final approved. | |
10/28/2024 | COT - RSPL - Plumbing Final | Passed | 10-28-24-all previously noted items from recent inspections have been corrected. Building final approved. | |
10/28/2024 | RSBU - Building Final | Passed | 10-28-24-all previously noted items from recent inspections have been corrected. Building final approved. | |
10/28/2024 | RSBU - Building Progress | Passed | 10-28-24-all previously noted items from recent inspections have been corrected. Building final approved. |