Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
03/06/2024
Applicant:
Christi Swenson
Description:
PULT3519-3 T21-M0048 SFR

Permit Reviews

Permit Number - TC-MDP-0224-00176
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Start Date Submittal Complete Date Status  
03/08/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/21/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0224-00176
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Total Outstanding Activity Conditions - 6
Date Name
02/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/20/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/20/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/20/2024 Post-Tension Inspection Report is required.
03/20/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/20/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0224-00176
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Date Description Comments
02/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00176
Permit Description: PULT3519-3 T21-M0048 SFR
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/16/2024 COT - RSPL - Rough Soil Passed
04/18/2024 COT - RSPL - Sewer Passed
04/23/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/23/2024 COT - RSBU - Preslab Passed
04/23/2024 COT - RSEL - Electrical Underground Passed
05/21/2024 COT - RSBU - Roof Nailing Passed
05/21/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/04/2024 BULD - Electrical Clearance Passed
06/13/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/13/2024 COT - RSPL - Gas Pressure Test Passed
06/13/2024 COT - RSPL - Yard Water Line Passed
07/09/2024 COT - RSBU - Interior Shear Bracing Passed
09/05/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 9/5/2024
09/13/2024 COT - RSEL - Grounding/Bonding Passed
09/13/2024 RSBU - Building Progress Passed
09/18/2024 COT - RSEL - Electrical Final Passed
09/18/2024 COT - RSEL - Outdoor Lighting Passed
09/18/2024 COT - RSME - Mechanical Final Passed
09/18/2024 COT - RSPL - Plumbing Final Passed
09/18/2024 ENGR Engineering Final Passed Remove nursery stake.
Remove brick pallet from front yard.
09/20/2024 RSBU - Building Final Passed 9-20-2024,all corrections made. Building final approved.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
7585 - LE LOT 03604 - SIC-2024-03-06_V1.PDF DOCUMENTS VIEW
LE 03604_V1.PDF DOCUMENTS VIEW