Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0224-00166
Permit Details
Apply Date:
06/18/2024
Applicant:
Craig Morczynski
Description:
SFR LENNLE4002 T22-M0046
Permit Reviews
Permit Number - TC-MDP-0224-00166
Permit Status: Issued
Permit Description: SFR LENNLE4002 T22-M0046
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/21/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/24/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0224-00166
Permit Status: Issued
Permit Description: SFR LENNLE4002 T22-M0046
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
02/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
06/24/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
06/24/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
06/24/2024 | Post-Tension Inspection Report is required. |
06/24/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
07/13/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0224-00166
Permit Status: Issued
Permit Description: SFR LENNLE4002 T22-M0046
Date | Description | Comments |
---|---|---|
02/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/24/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0224-00166
Permite Description: SFR LENNLE4002 T22-M0046
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/10/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | Failed per previous notes 9/10/24 |
09/11/2024 | COT - RSBU - Preslab | N/A | Re-inspection required | Same as before 9/11/24 |
10/03/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | Add anchor bolts at breaks in bottom plates, load bearing wall in garage and per shear wall schedule. Missing king studs at bedroom 3. Loose shear wall at bedroom 2. 9/26/2024 10/2/24: workers in house, could not properly inspect framing, 10/3/24: per previous notes left on 9/26/24 |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0224-00166
Permit Description: SFR LENNLE4002 T22-M0046
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/29/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 8/29/2024 | |
08/30/2024 | COT - RSPL - Rough Soil | Passed | ||
08/30/2024 | COT - RSPL - Sewer | Passed | ||
09/09/2024 | COT - RSEL - Electrical Underground | Passed | ||
09/09/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
09/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Approved. Okay for concrete placement. 9/13/2024 | |
09/13/2024 | COT - RSBU - Preslab | Passed | Approved. Okay for concrete placement. 9/13/2024 | |
09/26/2024 | COT - RSBU - Roof Nailing | Passed |
Scheduled Inspections
Scheduled Inspections - TC-MDP-0224-00166
Status: Issued
Description: SFR LENNLE4002 T22-M0046
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
10/08/2024 | COT - RSBU - Exterior Clips/Sheathing | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.