Permit: TC-MDP-0224-00164
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6748 E VIA DE AYATE
Address NEW:
6748 E VIA DE AYATE
Apply Date:
06/27/2024
Applicant:
Craig Morczynski
Description:
SFR LENNLE4001 T22-M0045
Permit Reviews
Permit Number - TC-MDP-0224-00164
Permit Status: Inspections complete
Permit Description: SFR LENNLE4001 T22-M0045
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/27/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 07/01/2024 | APPROVED |
| 01/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/15/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0224-00164
Permit Status: Inspections complete
Permit Description: SFR LENNLE4001 T22-M0045
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 06/28/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 06/28/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 06/28/2024 | Post-Tension Inspection Report is required. |
| 06/28/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0224-00164
Permit Status: Inspections complete
Permit Description: SFR LENNLE4001 T22-M0045
| Date | Description | Comments |
|---|---|---|
| 02/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/16/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 02/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 07/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/28/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00164
Permit Description: SFR LENNLE4001 T22-M0045
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/24/2025 | COT - RSPL - Rough Soil | Passed | 24 FEB 25 1. Ok to backfill, shading required. |
|
| 02/24/2025 | COT - RSPL - Sewer | Passed | ||
| 02/24/2025 | COT - RSPL - Yard Water Line | Passed | 24 FEB 25 1. Ok to backfill, shading required. |
|
| 03/06/2025 | COT - RSBU - Preslab | Passed | ||
| 03/06/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 03/06/2025 | COT - RSEL - Electrical Underground | Passed | 6 Mar 25 Not ready |
|
| 03/06/2025 | COT - RSEL - Grounding/Bonding | Passed | 6 Mar 25 Pass |
|
| 03/21/2025 | COT - RSBU - Roof Nailing | Passed | Nailing, hold downs, and trusses per plan, 3/21/25 | |
| 03/21/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Nailing, hold downs, and trusses per plan, 3/21/25 | |
| 04/01/2025 | BULD - Electrical Clearance | Passed | 1 April 2025 TEP CLEARANCE:ECO |
|
| 04/04/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 04/08/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/17/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/05/2025 | COT - BULD - SWG Clearance | Passed | 6.5.25 SWG clearance. Shut offs present, sediment traps observed, grounded at gas, good to go. |
|
| 06/17/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/17/2025 | ENGR Engineering Final | Passed | A defective or broken block with 3.5” hole in it at FG is in rear Screen wall in back yard. It needs to be repaired. in addition Port a potty should be moved further away from house. | |
| 06/17/2025 | RSBU - Building Progress | Passed | ||
| 06/23/2025 | COT - RSEL - Electrical Final | Passed | Approved. Corrections were made. 6/23/2025 | |
| 06/23/2025 | COT - RSME - Mechanical Final | Passed | Approved. Corrections were made. 6/23/2025 | |
| 06/23/2025 | COT - RSPL - Plumbing Final | Passed | Approved. Corrections were made. 6/23/2025 | |
| 06/23/2025 | RSBU - Building Final | Passed | Approved. Corrections were made. 6/23/2025 |