Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/23/2024
Applicant:
Daria Hopkins
Description:
SFR MER1502320 T21-M0070

Permit Reviews

Permit Number - TC-MDP-0223-00601
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070
Start Date Submittal Complete Date Status  
02/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/11/2024 APPROVED Review Details
06/28/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/01/2024 APPROVED Review Details
10/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/10/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00601
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070
Date Description Comments
03/08/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/08/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/08/2024 Post-Tension Inspection Report is required.
02/27/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/27/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/28/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00601
Permit Description: SFR MER1502320 T21-M0070
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/10/2024 COT - RSPL - Rough Soil Passed
05/10/2024 COT - RSPL - Yard Water Line Passed
05/10/2024 COT - RSPL - Sewer Passed
05/20/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/20/2024 COT - RSBU - Preslab Passed
05/20/2024 COT - RSEL - Electrical Underground Passed
05/20/2024 COT - RSEL - Grounding/Bonding Passed
06/06/2024 COT - RSBU - Roof Nailing Passed
06/06/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/28/2024 BULD - Electrical Clearance Passed TEP ECO Clearance issued
06/28/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
06/28/2024 COT - RSPL - Backwater Valve Passed
06/28/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under 15# of air pressure with no leaks. Okay to proceed.
07/17/2024 COT - RSBU - Interior Shear Bracing Passed
09/10/2024 COT - BULD - SWG Clearance Passed SWG for meter connection only
09/18/2024 COT - RSEL - Electrical Final Passed
09/18/2024 COT - RSEL - Outdoor Lighting Passed
09/18/2024 COT - RSME - Mechanical Final Passed
09/18/2024 COT - RSPL - Plumbing Final Passed
09/18/2024 ENGR Engineering Final Passed
09/18/2024 RSBU - Building Final Passed
09/18/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
TRUSS DESIGN DRAWINGS_V1.PDF DOCUMENTS VIEW
147702 PT LOT 73 COMPLETE-2024-06-28_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 73 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 73 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 73 SPECIAL INSPECTION CERTIFICATE-2024-02-23_V1.PDF DOCUMENTS VIEW