Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
12/19/2023
Applicant:
Daria Hopkins
Description:
SFR MER1502320 T21-M0070

Permit Reviews

Permit Number - TC-MDP-0223-00598
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070
Start Date Submittal Complete Date Status  
03/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/01/2024 APPROVED Review Details
12/19/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/26/2023 APPROVED Review Details
10/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/18/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00598
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070
Date Description Comments
12/19/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/19/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/19/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
12/20/2023 Post-Tension Inspection Report is required.
12/19/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/19/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00598
Permit Description: SFR MER1502320 T21-M0070
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/17/2024 COT - RSPL - Sewer Passed Underground plumbing is properly installed and under test. Sewer is connected to underground plumbing and tracer wire is installed. Okay to shade and backfill trenches.
01/17/2024 COT - RSPL - Rough Soil Passed Underground plumbing is properly installed and under test. Sewer is connected to underground plumbing and tracer wire is installed. Okay to shade and backfill trenches.
01/18/2024 COT - RSPL - Yard Water Line Passed
02/01/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/01/2024 COT - RSBU - Preslab Passed
02/01/2024 COT - RSEL - Grounding/Bonding Passed
02/01/2024 COT - RSEL - Electrical Underground Passed
02/29/2024 COT - RSBU - Exterior Clips/Sheathing Passed
02/29/2024 COT - RSBU - Roof Nailing Passed
03/22/2024 BULD - Electrical Clearance Passed
03/22/2024 COT - RSPL - Gas Pressure Test Passed
03/22/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/11/2024 COT - RSBU - Interior Shear Bracing Passed
06/12/2024 COT - BULD - SWG Clearance Passed Gas valves are installed in kitchen for range, laundry room for clothes dryer, and in garage for water heater. Okay to install meter. SWG Clearance given to Southwest Gas.
06/18/2024 COT - RSEL - Electrical Final Passed
06/18/2024 COT - RSEL - Outdoor Lighting Passed
06/18/2024 COT - RSME - Mechanical Final Passed
06/18/2024 COT - RSPL - Plumbing Final Passed
06/18/2024 ENGR Engineering Final Passed
06/18/2024 RSBU - Building Progress Passed
06/21/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
TRUSS DESIGN DRAWINGS_V1.PDF DOCUMENTS VIEW
145379 PT LOT 81 COMPLETE-2024-03-26_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 81 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 81 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 81 SPECIAL INSPECTION CERTIFICATE-2023-12-19_V1.PDF DOCUMENTS VIEW