Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/09/2023
Applicant:
Daria Hopkins
Description:
SFR 235.2960 T21-M0055

Permit Reviews

Permit Number - TC-MDP-0223-00593
Permit Status: Complete
Permit Description: SFR 235.2960 T21-M0055
Start Date Submittal Complete Date Status  
07/31/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/02/2024 APPROVED Review Details
02/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/07/2024 APPROVED Review Details
05/12/2023 RESIDENTIAL NEW DWELLING v.1 05/16/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00593
Permit Status: Complete
Permit Description: SFR 235.2960 T21-M0055
Date Description Comments
05/15/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/15/2023 Post-Installed Anchor Inspection Report is required.
02/07/2024 Post-Tension Inspection Report is required.
02/07/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/02/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/15/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/15/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00593
Permit Description: SFR 235.2960 T21-M0055
Total Completed Inspections - 22
Date Description Inspector Results Comments
07/20/2023 COT - RSPL - Rough Soil Passed
07/20/2023 COT - RSPL - Sewer Passed
07/20/2023 COT - RSPL - Yard Water Line Passed
08/11/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/11/2023 COT - RSBU - Preslab Passed
08/11/2023 COT - RSEL - Electrical Underground Passed
08/11/2023 COT - RSEL - Grounding/Bonding Passed
08/25/2023 COT - RSBU - Roof Nailing Passed
08/29/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/06/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/06/2023 BULD - Electrical Clearance Passed
10/06/2023 COT - RSPL - Gas Pressure Test Passed
11/03/2023 COT - RSBU - Interior Shear Bracing Passed
01/03/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 1/3/2023
01/26/2024 ENGR Engineering Final Passed
01/26/2024 RSBU - Building Progress Passed
01/26/2024 COT - RSME - Mechanical Final Passed
01/26/2024 COT - RSPL - Gas Final Passed
02/12/2024 RSBU - Building Final Passed
02/12/2024 COT - RSEL - Electrical Final Passed
02/12/2024 COT - RSEL - Outdoor Lighting Passed
02/12/2024 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 41 FINAL SPECIAL INSPECTION CERT-2024-02-06_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 41 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 41 SPECIAL INSPECTION CERTIFICATE-2023-05-09_V1.PDF DOCUMENTS VIEW
LOT 41 APPLICATION_V1.PDF DOCUMENTS VIEW