Permit: TC-MDP-0223-00576
Permit Details
Apply Date:
02/02/2023
Applicant:
Daria Hopkins
Description:
SFR 135.1870 T21-M0054
Permit Reviews
Permit Number - TC-MDP-0223-00576
Permit Status: Complete
Permit Description: SFR 135.1870 T21-M0054
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/13/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/17/2023 | APPROVED |
02/14/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/15/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0223-00576
Permit Status: Complete
Permit Description: SFR 135.1870 T21-M0054
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
02/14/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
02/14/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0223-00576
Permit Status: Complete
Permit Description: SFR 135.1870 T21-M0054
Date | Description | Comments |
---|---|---|
02/14/2023 | Post-Installed Anchor Inspection Report is required. | |
02/14/2023 | Post-Tension Inspection Report is required. | |
02/14/2023 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00576
Permite Description: SFR 135.1870 T21-M0054
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/12/2023 | RSBU - Building Progress | N/A | Partial Pass | |
08/16/2023 | COT - RSPL - Gas Final | N/A | Re-inspection required | No access to inside of house. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00576
Permit Description: SFR 135.1870 T21-M0054
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/03/2023 | COT - RSPL - Sewer | Passed | Waste line is connected to main sewer line. | |
04/03/2023 | COT - RSPL - Yard Water Line | Passed | Water line is trenched from meter box to house connection point. Holding 60# of air pressure. Okay to backfill trench. | |
04/03/2023 | COT - RSPL - Rough Soil | Passed | Underground sewer lines are in place and under a water test. Okay to backfill trenches. | |
04/12/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
04/13/2023 | RSBU - Building Progress | Passed | 4/13/2023: pre slab electrical underground and post tension good all corrections made from previous inspection | |
04/25/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
04/25/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/25/2023 | COT - RSBU - Preslab | Passed | ||
04/25/2023 | COT - RSBU - Roof Nailing | Passed | ||
05/15/2023 | COT - RSEL - Electrical Underground | Passed | ||
05/15/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
05/22/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
06/05/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/11/2023 | BULD - Electrical Clearance | Passed | ||
07/31/2023 | COT - BULD - SWG Clearance | Passed | Swg clearance for meter only. | |
08/17/2023 | COT - RSEL - Electrical Final | Passed | ||
08/17/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/17/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/17/2023 | COT - RSPL - Gas Final | Passed | ||
08/21/2023 | RSBU - Building Final | Passed | ||
08/21/2023 | COT - RSME - Mechanical Final | Passed |