Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0223-00575
Permit Details
Apply Date:
02/02/2023
Applicant:
Daria Hopkins
Description:
SFR 135.1870 T21-M0054
Permit Reviews
Permit Number - TC-MDP-0223-00575
Permit Status: Complete
Permit Description: SFR 135.1870 T21-M0054
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/06/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/06/2023 | APPROVED |
06/30/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/03/2023 | APPROVED |
02/14/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/15/2023 | APPROVED |
07/05/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/05/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0223-00575
Permit Status: Complete
Permit Description: SFR 135.1870 T21-M0054
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
02/14/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0223-00575
Permit Status: Complete
Permit Description: SFR 135.1870 T21-M0054
Date | Description | Comments |
---|---|---|
02/14/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
02/14/2023 | Post-Installed Anchor Inspection Report is required. | |
02/14/2023 | Post-Tension Inspection Report is required. | |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/14/2023 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00575
Permit Description: SFR 135.1870 T21-M0054
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/03/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and matches plans. Okay to backfill trenches. | |
04/03/2023 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to main sewer line. Okay to backfill trench. | |
04/03/2023 | COT - RSPL - Yard Water Line | Passed | Yard water line is connected to meter and under pressure. Okay to backfill trench. | |
04/17/2023 | RSBU - Building Progress | Passed | Pass | |
04/28/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/28/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
04/28/2023 | COT - RSBU - Preslab | Passed | ||
04/28/2023 | COT - RSBU - Roof Nailing | Passed | ||
04/28/2023 | COT - RSEL - Electrical Underground | Passed | ||
04/28/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
05/25/2023 | BULD - Electrical Clearance | Passed | ||
05/31/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
06/01/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
06/20/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/08/2023 | COT - BULD - SWG Clearance | Passed | Swg clearance for meter only. | |
08/10/2023 | RSBU - Building Final | Passed | Thermostat must be 54" oc above floor per plans | |
08/10/2023 | COT - RSEL - Electrical Final | Passed | ||
08/10/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/10/2023 | COT - RSME - Mechanical Final | Passed | Thermostat must be 54" oc above floor per plans | |
08/10/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/10/2023 | COT - RSPL - Gas Final | Passed |