Permit: TC-MDP-0223-00570
Permit Details
Apply Date:
02/09/2023
Applicant:
Daria Hopkins
Description:
SFR 135.2110 T21-M0053
Permit Reviews
Permit Number - TC-MDP-0223-00570
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/07/2024 | APPROVED |
05/11/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/06/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0223-00570
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Date | Description | Comments |
---|---|---|
05/11/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
05/11/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/07/2024 | Post-Tension Inspection Report is required. | |
05/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
05/11/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
06/06/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00570
Permite Description: SFR 135.2110 T21-M0053
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/19/2024 | ENGR Engineering Final | N/A | Not Ready | Still no grade cert passed sticker in panel Cleanout still not cut down to grade |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00570
Permit Description: SFR 135.2110 T21-M0053
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/10/2023 | COT - RSPL - Sewer | Passed | Underground plumbing and sewer line connection is complete. Okay to backfill and compact soil. Shade piping first. | |
07/10/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete. Okay to backfill and compact soil. Shade piping first. | |
07/10/2023 | COT - RSPL - Yard Water Line | Passed | Water line is connected to meter and fully charged. Okay to shade piping, backfill trench and compact soil. | |
07/27/2023 | COT - RSBU - Preslab | Passed | ||
07/27/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
07/27/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/10/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/10/2023 | COT - RSBU - Roof Nailing | Passed | ||
09/29/2023 | BULD - Electrical Clearance | Passed | ||
09/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
10/02/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
11/01/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
01/16/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
01/16/2024 | RSBU - Building Progress | Passed | ||
01/16/2024 | RSBU - Building Final | Passed | ||
01/16/2024 | COT - RSEL - Electrical Final | Passed | ||
01/16/2024 | COT - RSEL - Electrical Underground | Passed | ||
01/16/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
01/16/2024 | COT - RSME - Mechanical Final | Passed | ||
01/16/2024 | COT - RSPL - Gas Final | Passed | ||
01/16/2024 | COT - RSPL - Plumbing Final | Passed | ||
03/25/2024 | ENGR Engineering Final | Passed | Drainage on left side encroaching on adjourning property. This falls on the builder to correct. |