Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/13/2023
Applicant:
Daria Hopkins
Description:
SFR 135.2110 T21-M0053

Permit Reviews

Permit Number - TC-MDP-0223-00568
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Start Date Submittal Complete Date Status  
06/13/2023 RESIDENTIAL NEW DWELLING v.1 06/15/2023 APPROVED Review Details
02/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/07/2024 APPROVED Review Details
09/27/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/27/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00568
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Date Description Comments
06/13/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/13/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/27/2023 Post-Tension Inspection Report is required.
06/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/13/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/15/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00568
Permit Description: SFR 135.2110 T21-M0053
Total Completed Inspections - 22
Date Description Inspector Results Comments
10/25/2023 COT - RSPL - Yard Water Line Passed
10/26/2023 COT - RSPL - Rough Soil Passed For future plumbing underground inspections: 5' stack must be filled to top.
10/26/2023 COT - RSPL - Sewer Passed
11/03/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/03/2023 COT - RSBU - Preslab Passed
11/03/2023 COT - RSEL - Electrical Underground Passed
11/03/2023 COT - RSEL - Grounding/Bonding Passed
11/27/2023 COT - RSBU - Roof Nailing Passed
12/01/2023 COT - RSBU - Exterior Clips/Sheathing Passed
01/24/2024 COT - RSPL - Gas Pressure Test Passed
01/26/2024 BULD - Electrical Clearance Passed
01/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/12/2024 COT - RSBU - Interior Shear Bracing Passed
03/27/2024 COT - BULD - SWG Clearance Passed SWG for meter only
04/09/2024 ENGR Engineering Final Passed Ok to release lot #67
04/09/2024 RSBU - Building Progress Passed
04/09/2024 RSBU - Building Final Passed
04/09/2024 COT - RSEL - Electrical Final Passed
04/09/2024 COT - RSEL - Outdoor Lighting Passed
04/09/2024 COT - RSME - Mechanical Final Passed
04/09/2024 COT - RSPL - Gas Final Passed
04/09/2024 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
143686 PT LOT 67 COMPLETE-2024-02-06_V1.PDF DOCUMENTS VIEW
143686 PT LOT 67 COMPLETE-2024-02-06_V1.PDF DOCUMENTS VIEW
LOT 67 SPECIAL INSPECTION CERTIFICATE-2023-09-27_V1.PDF DOCUMENTS VIEW
PATTISON SIC LETTER 9.27.23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 67 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 67 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 67 SPECIAL INSPECTION CERTIFICATE-2023-06-13_V1.PDF DOCUMENTS VIEW