Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/09/2023
Applicant:
Daria Hopkins
Description:
SFR 135.2110 T21-M0053

Permit Reviews

Permit Number - TC-MDP-0223-00565
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Start Date Submittal Complete Date Status  
02/01/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/02/2024 APPROVED Review Details
02/14/2023 RESIDENTIAL NEW DWELLING v.1 02/15/2023 APPROVED Review Details
01/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00565
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Date Description Comments
02/14/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
02/14/2023 Post-Installed Anchor Inspection Report is required.
02/14/2023 Post-Tension Inspection Report is required.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
02/14/2023 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
02/14/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00565
Permit Description: SFR 135.2110 T21-M0053
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/15/2023 COT - RSPL - Yard Water Line Passed
03/15/2023 COT - RSPL - Sewer Passed
03/23/2023 COT - RSEL - Grounding/Bonding Passed
03/28/2023 RSBU - Building Progress Passed
04/05/2023 COT - RSBU - Preslab Passed Pass
04/05/2023 COT - RSPL - Rough Soil Passed Pass
04/05/2023 COT - RSBU - Excavation/Rebar/Zoning Passed pass
04/11/2023 COT - RSBU - Roof Nailing Passed Roof nailing passed
04/11/2023 COT - RSBU - Exterior Clips/Sheathing Passed 4/11/23- trust calcs provided and anchor bolts added passed
04/28/2023 BULD - Electrical Clearance Passed Clearance for TEP ECO. 4/28/2023
04/28/2023 COT - RSEL - Electrical Underground Passed
04/28/2023 COT - RSPL - Gas Pressure Test Passed
05/03/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/16/2023 COT - RSBU - Interior Shear Bracing Passed
07/14/2023 COT - BULD - SWG Clearance Passed 7/14/23: SWG Clearance for meter only.
07/27/2023 COT - RSPL - Gas Final Passed
08/09/2023 RSBU - Building Final Passed
08/09/2023 COT - RSEL - Electrical Final Passed
08/09/2023 COT - RSEL - Outdoor Lighting Passed
08/09/2023 COT - RSME - Mechanical Final Passed
08/09/2023 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
139426 PT LOT 24 COMPLETE-2024-01-08_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 24 - APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 24 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 24 SPECIAL INSPECTION CERTIFICATE-2023-02-13_V1.PDF DOCUMENTS VIEW