Permit: TC-MDP-0223-00552
Permit Details
Apply Date:
01/31/2023
Applicant:
Daria Hopkins
Description:
SFR MERI156021 T21-M0063
Permit Reviews
Permit Number - TC-MDP-0223-00552
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/02/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/02/2023 | APPROVED |
12/28/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/28/2023 | APPROVED |
02/10/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/14/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0223-00552
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Date | Description | Comments |
---|---|---|
02/10/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
02/10/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
02/10/2023 | Post-Installed Anchor Inspection Report is required. | |
02/10/2023 | Post-Tension Inspection Report is required. | |
02/10/2023 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
02/10/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00552
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/17/2023 | COT - RSPL - Yard Water Line | Passed | Approved. Okay to backfill. Shading is required. 4/17/2023 | |
04/17/2023 | COT - RSPL - Rough Soil | Passed | Approved. Okay to backfill. Shading is required. 4/17/2023 | |
04/26/2023 | COT - RSEL - Grounding/Bonding | Passed | 20 foot Ufer ground rebar is located in footing on left side of house. | |
04/26/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar reinforcement for shear wall hold downs are in place and wired to hold downs. Rebar reinforcement for Ufer ground is in place. | |
04/26/2023 | COT - RSBU - Preslab | Passed | All post-tension cabling is in place and properly supported off of ground. Rebar reinforcement is in place and properly supported off the ground. Ufer ground is in place. Block-outs for plumbing pipes are in place. Okay to pour concrete slab. | |
04/26/2023 | COT - RSEL - Electrical Underground | Passed | Electrical conduit for kitchen island is in place. | |
05/05/2023 | COT - RSBU - Roof Nailing | Passed | ||
05/10/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/18/2023 | RSEL - Electrical Progress | Passed | ||
05/18/2023 | RSME - Mechanical Progress | Passed | ||
05/18/2023 | RSPL - Plumbing Progress | Passed | ||
05/18/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
05/18/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
05/22/2023 | BULD - Electrical Clearance | Passed | 5-22-23: Temporary power breaker and weatherproof box with GFCI receptacle have been installed. ECO Clearance given, Okay to energize panel. | |
05/30/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/10/2023 | COT - RSPL - Sewer | Passed | 7/10/23: sewer line appears to be connected and functioning properly. | |
07/10/2023 | COT - RSPL - Gas Final | Passed | Gas valves have been installed in kitchen, laundry room, and garage for water heater. | |
07/31/2023 | RSBU - Building Final | Passed | ||
07/31/2023 | COT - RSEL - Electrical Final | Passed | ||
07/31/2023 | COT - RSME - Mechanical Final | Passed | ||
07/31/2023 | COT - RSPL - Plumbing Final | Passed |