Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0223-00550
Permit Details
Apply Date:
01/31/2023
Applicant:
Daria Hopkins
Description:
SFR MERI156021 T21-M0063
Permit Reviews
Permit Number - TC-MDP-0223-00550
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/09/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/14/2023 | APPROVED |
12/18/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/20/2023 | APPROVED |
05/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/23/2024 | APPROVED |
05/30/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/03/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0223-00550
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Date | Description | Comments |
---|---|---|
02/10/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
02/10/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
05/21/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
12/18/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/10/2023 | Post-Installed Anchor Inspection Report is required. | |
02/10/2023 | Post-Tension Inspection Report is required. | |
05/31/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
05/21/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/10/2023 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
05/21/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
02/10/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00550
Permite Description: SFR MERI156021 T21-M0063
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/04/2023 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00550
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/14/2023 | COT - RSPL - Sewer | Passed | ||
03/22/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Okay for concrete placement in slab. 3/22/2023 | |
03/22/2023 | COT - RSBU - Preslab | Passed | Okay for concrete placement in slab. 3/22/2023 | |
03/22/2023 | COT - RSEL - Electrical Underground | Passed | ||
03/22/2023 | COT - RSPL - Rough Soil | Passed | ||
03/22/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
04/03/2023 | COT - RSPL - Yard Water Line | Passed | 4-3-23: Water line is connected to main meter and under pressure. | |
04/06/2023 | COT - RSBU - Roof Nailing | Passed | ||
04/06/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/03/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 5/3/2023 | |
05/05/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
05/05/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
05/16/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
06/28/2023 | COT - RSPL - Gas Final | Passed | Gas valves are installed for hot water heater, clothes dryer, and kitchen stove. Okay to install gas meter. | |
06/28/2023 | COT - BULD - SWG Clearance | Passed | Gas valves are installed for hot water heater, clothes dryer, and kitchen stove. Okay to install gas meter. | |
07/13/2023 | RSBU - Building Final | Passed | ||
07/13/2023 | COT - RSEL - Electrical Final | Passed | ||
07/13/2023 | COT - RSME - Mechanical Final | Passed | ||
07/13/2023 | COT - RSPL - Plumbing Final | Passed | ||
12/19/2023 | COT - RSEL - Outdoor Lighting | Passed |