Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/08/2023
Applicant:
Daria Hopkins
Description:
SFR MER2302380 T21-M0068

Permit Reviews

Permit Number - TC-MDP-0223-00529
Permit Status: Complete
Permit Description: SFR MER2302380 T21-M0068
Start Date Submittal Complete Date Status  
03/22/2023 RESIDENTIAL NEW DWELLING v.1 03/24/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0223-00529
Permit Status: Complete
Permit Description: SFR MER2302380 T21-M0068
Total Outstanding Activity Conditions - 5
Date Name
03/22/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
03/22/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/22/2023 Post-Installed Anchor Inspection Report is required.
03/22/2023 Post-Tension Inspection Report is required.
03/22/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00529
Permit Description: SFR MER2302380 T21-M0068
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/27/2023 COT - RSPL - Rough Soil Passed
04/27/2023 COT - RSPL - Sewer Passed
04/27/2023 COT - RSPL - Yard Water Line Passed
05/08/2023 COT - RSEL - Grounding/Bonding Passed
05/08/2023 COT - RSBU - Preslab Passed
05/08/2023 COT - RSEL - Electrical Underground Passed
05/08/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
05/11/2023 COT - RSPL - Backwater Valve Passed
05/23/2023 COT - RSBU - Exterior Clips/Sheathing Passed
05/23/2023 COT - RSBU - Roof Nailing Passed
07/05/2023 BULD - Electrical Clearance Passed
07/05/2023 RSBU - Building Progress Passed
07/05/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7/5/23: Fire foam in kitchen, Staple missing in bedroom 2 second floor, Fire block in shower, Fireblock duct work in bedroom 3, exposed wire in bedroom 3.
07/05/2023 COT - RSPL - Gas Pressure Test Passed
07/20/2023 COT - RSBU - Interior Shear Bracing Passed
09/07/2023 COT - BULD - SWG Clearance Passed Approved, SWG Clearance is required for the new meter
09/21/2023 RSBU - Building Final Passed 9/21/23: final inspection approved
09/21/2023 COT - RSEL - Electrical Final Passed
09/21/2023 COT - RSEL - Outdoor Lighting Passed
09/21/2023 COT - RSME - Mechanical Final Passed
09/21/2023 COT - RSPL - Gas Final Passed
09/21/2023 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 11 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 11 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 11 SPECIAL INSPECTION CERTIFICATE-2023-03-17_V1.PDF DOCUMENTS VIEW