Permit: TC-MDP-0223-00528
Permit Details
Apply Date:
01/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER2302380 T21-M0068
Permit Reviews
Permit Number - TC-MDP-0223-00528
Permit Status: Complete
Permit Description: SFR MER2302380 T21-M0068
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/27/2024 | APPROVED |
01/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/11/2024 | APPROVED |
06/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/14/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0223-00528
Permit Status: Complete
Permit Description: SFR MER2302380 T21-M0068
Date | Description | Comments |
---|---|---|
01/05/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
01/05/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/05/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/09/2024 | Post-Tension Inspection Report is required. | |
01/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/14/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
01/09/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00528
Permite Description: SFR MER2302380 T21-M0068
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/23/2024 | COT - RSEL - Grounding/Bonding | N/A | Not Applicable | |
06/06/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | 6/6/24: receptacle or breaker needs to be GFCI protected. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00528
Permit Description: SFR MER2302380 T21-M0068
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/12/2024 | COT - RSPL - Rough Soil | Passed | ||
04/12/2024 | COT - RSPL - Yard Water Line | Passed | ||
04/23/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/23/2024 | COT - RSBU - Preslab | Passed | ||
04/23/2024 | COT - RSEL - Electrical Underground | Passed | ||
05/06/2024 | COT - RSPL - Sewer | Passed | Sewer line is connected to underground plumbing and under a water test. Okay to shade pipe and backfill trench. | |
05/14/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/14/2024 | COT - RSBU - Roof Nailing | Passed | ||
06/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
06/06/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
06/11/2024 | BULD - Electrical Clearance | Passed | ||
07/03/2024 | COT - RSBU - Interior Shear Bracing | Passed | Shear walls are properly screwed per plan requirements. Okay to proceed with tape, texture, and paint. | |
08/07/2024 | COT - BULD - SWG Clearance | Passed | All piped locations for gas appliances have gas valves installed. Okay to install gas meter. SWG Clearance issued. | |
08/29/2024 | COT - RSEL - Electrical Final | Passed | ||
08/29/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
08/29/2024 | COT - RSME - Mechanical Final | Passed | ||
08/29/2024 | COT - RSPL - Plumbing Final | Passed | ||
08/29/2024 | RSBU - Building Final | Passed | ||
08/29/2024 | RSBU - Building Progress | Passed | ||
08/29/2024 | ENGR Engineering Final | Passed |