Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0223-00525
Permit Details
Apply Date:
10/19/2023
Applicant:
Daria Hopkins
Description:
SFR MER2302690 T21-M0069
Permit Reviews
Permit Number - TC-MDP-0223-00525
Permit Status: Complete
Permit Description: SFR MER2302690 T21-M0069
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/07/2024 | APPROVED |
10/31/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/31/2024 | APPROVED |
10/20/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/23/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0223-00525
Permit Status: Complete
Permit Description: SFR MER2302690 T21-M0069
Date | Description | Comments |
---|---|---|
10/20/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
10/20/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
10/20/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/07/2024 | Post-Tension Inspection Report is required. | |
10/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/31/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
10/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
10/31/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
10/23/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00525
Permite Description: SFR MER2302690 T21-M0069
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/21/2024 | ENGR Engineering Final | N/A | Not Ready | roof incomplete, landscape in driveway, missing yard gate. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00525
Permit Description: SFR MER2302690 T21-M0069
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2023 | COT - RSPL - Yard Water Line | Passed | ||
12/19/2023 | COT - RSPL - Rough Soil | Passed | ||
12/27/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
12/27/2023 | COT - RSBU - Preslab | Passed | ||
12/27/2023 | COT - RSEL - Electrical Underground | Passed | ||
12/27/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
01/17/2024 | COT - RSBU - Roof Nailing | Passed | Roof sheathing is properly installed and nailed off, H2.5 clips are installed on every rafter. Okay to proceed with drying in roof. | |
01/17/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Roof sheathing is properly installed and nailed off, H2.5 clips are installed on every rafter. Okay to proceed with drying in roof. Shear wall panels are properly installed and nailed off, bolts and plates are installed. Okay to proceed with window and door installation and drying in exterior walls. |
|
03/06/2024 | BULD - Electrical Clearance | Passed | ||
03/06/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
03/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
03/13/2024 | COT - RSPL - Sewer | Passed | ||
04/04/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
06/12/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed in kitchen for range, laundry room for clothes dryer, and in garage for water heater. Okay to install meter. SWG Clearance given to Southwest Gas. | |
06/21/2024 | COT - RSEL - Electrical Final | Passed | ||
06/21/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
06/21/2024 | COT - RSME - Mechanical Final | Passed | ||
06/21/2024 | COT - RSPL - Plumbing Final | Passed | ||
06/21/2024 | RSBU - Building Final | Passed | ||
06/21/2024 | RSBU - Building Progress | Passed | ||
09/11/2024 | ENGR Engineering Final | Passed |