Permit: TC-MDP-0223-00524
Permit Details
Apply Date:
11/16/2023
Applicant:
Daria Hopkins
Description:
SFR MER2302690 T21-M0069
Permit Reviews
Permit Number - TC-MDP-0223-00524
Permit Status: Complete
Permit Description: SFR MER2302690 T21-M0069
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/01/2024 | APPROVED |
10/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/18/2024 | APPROVED |
11/16/2023 | RESIDENTIAL NEW DWELLING v.1 | 11/22/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0223-00524
Permit Status: Complete
Permit Description: SFR MER2302690 T21-M0069
Date | Description | Comments |
---|---|---|
11/16/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
11/16/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
11/16/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
11/17/2023 | Post-Tension Inspection Report is required. | |
11/16/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
11/22/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
11/22/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
10/18/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
11/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00524
Permit Description: SFR MER2302690 T21-M0069
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/08/2024 | COT - RSPL - Rough Soil | Passed | ||
01/08/2024 | COT - RSPL - Backwater Valve | Passed | ||
01/08/2024 | COT - RSPL - Yard Water Line | Passed | ||
01/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
01/16/2024 | COT - RSBU - Preslab | Passed | ||
01/16/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
01/16/2024 | COT - RSEL - Electrical Underground | Passed | ||
01/31/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
01/31/2024 | COT - RSBU - Roof Nailing | Passed | ||
03/04/2024 | BULD - Electrical Clearance | Passed | ||
03/04/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
03/04/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
03/13/2024 | COT - RSPL - Sewer | Passed | ||
03/28/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
05/20/2024 | COT - BULD - SWG Clearance | Passed | ||
06/14/2024 | COT - RSEL - Electrical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed for all outlets throughout house. Outdoor lighting is installed and meets plan requirements. Exterior front landscaping, driveway, and sidewalks are installed. Sewer clean outs are cut to landscaping grade. HVAC Equipment is properly installed and has the correct breaker size in the electrical panel. Okay to issue Certificate of Occupancy once all other agencies have inspected and approved their portion of the building permit. | |
06/14/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed for all outlets throughout house. Outdoor lighting is installed and meets plan requirements. Exterior front landscaping, driveway, and sidewalks are installed. Sewer clean outs are cut to landscaping grade. HVAC Equipment is properly installed and has the correct breaker size in the electrical panel. Okay to issue Certificate of Occupancy once all other agencies have inspected and approved their portion of the building permit. | |
06/14/2024 | COT - RSME - Mechanical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed for all outlets throughout house. Outdoor lighting is installed and meets plan requirements. Exterior front landscaping, driveway, and sidewalks are installed. Sewer clean outs are cut to landscaping grade. HVAC Equipment is properly installed and has the correct breaker size in the electrical panel. Okay to issue Certificate of Occupancy once all other agencies have inspected and approved their portion of the building permit. | |
06/14/2024 | COT - RSPL - Plumbing Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed for all outlets throughout house. Outdoor lighting is installed and meets plan requirements. Exterior front landscaping, driveway, and sidewalks are installed. Sewer clean outs are cut to landscaping grade. HVAC Equipment is properly installed and has the correct breaker size in the electrical panel. Okay to issue Certificate of Occupancy once all other agencies have inspected and approved their portion of the building permit. | |
06/14/2024 | ENGR Engineering Final | Passed | ||
06/14/2024 | RSBU - Building Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed for all outlets throughout house. Outdoor lighting is installed and meets plan requirements. Exterior front landscaping, driveway, and sidewalks are installed. Sewer clean outs are cut to landscaping grade. HVAC Equipment is properly installed and has the correct breaker size in the electrical panel. Okay to issue Certificate of Occupancy once all other agencies have inspected and approved their portion of the building permit. | |
06/14/2024 | RSBU - Building Progress | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed for all outlets throughout house. Outdoor lighting is installed and meets plan requirements. Exterior front landscaping, driveway, and sidewalks are installed. Sewer clean outs are cut to landscaping grade. HVAC Equipment is properly installed and has the correct breaker size in the electrical panel. Okay to issue Certificate of Occupancy once all other agencies have inspected and approved their portion of the building permit. |