Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
10/19/2023
Applicant:
Daria Hopkins
Description:
SFR MER2302690 T21-M0069

Permit Reviews

Permit Number - TC-MDP-0223-00523
Permit Status: Complete
Permit Description: SFR MER2302690 T21-M0069
Start Date Submittal Complete Date Status  
10/19/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/23/2023 APPROVED Review Details
09/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/26/2024 APPROVED Review Details
02/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/07/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00523
Permit Status: Complete
Permit Description: SFR MER2302690 T21-M0069
Date Description Comments
10/19/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/19/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/19/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/07/2024 Post-Tension Inspection Report is required.
10/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/26/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/26/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00523
Permit Description: SFR MER2302690 T21-M0069
Total Completed Inspections - 22
Date Description Inspector Results Comments
12/14/2023 COT - RSPL - Rough Soil Passed
12/14/2023 COT - RSPL - Yard Water Line Passed
12/22/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
12/22/2023 COT - RSBU - Preslab Passed
12/22/2023 COT - RSEL - Electrical Underground Passed
12/22/2023 COT - RSEL - Grounding/Bonding Passed
12/22/2023 COT - RSPL - Backwater Valve Passed
01/24/2024 COT - RSBU - Exterior Clips/Sheathing Passed
01/25/2024 COT - RSBU - Roof Nailing Passed
02/23/2024 BULD - Electrical Clearance Passed TEP eco
02/23/2024 COT - RSPL - Gas Pressure Test Passed
02/29/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/13/2024 COT - RSPL - Sewer Passed
03/19/2024 COT - RSBU - Interior Shear Bracing Passed
04/30/2024 COT - BULD - SWG Clearance Passed
05/21/2024 COT - RSEL - Outdoor Lighting Passed
05/21/2024 COT - RSME - Mechanical Final Passed
05/21/2024 RSBU - Building Progress Passed
05/29/2024 COT - RSEL - Electrical Final Passed 5/29/24: Above items have been corrected. Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, GFCI & AFCI breakers are installed for all required electrical outlets. Okay to issue Certificate of Occupancy once other agencies perform and pass their inspections.
05/29/2024 COT - RSPL - Plumbing Final Passed 5/29/24: Above items have been corrected. Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, GFCI & AFCI breakers are installed for all required electrical outlets. Okay to issue Certificate of Occupancy once other agencies perform and pass their inspections.
05/29/2024 RSBU - Building Final Passed 5/29/24: Above items have been corrected. Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, GFCI & AFCI breakers are installed for all required electrical outlets. Okay to issue Certificate of Occupancy once other agencies perform and pass their inspections.
05/29/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
144636 PT LOT 179 COMPLETE-2024-02-05_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 179 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 179 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 179 SPECIAL INSPECTION CERTIFICATE-2023-10-19_V1.PDF DOCUMENTS VIEW