Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
03/30/2023
Applicant:
Daria Hopkins
Description:
SFR MER1502580 T21-M0076

Permit Reviews

Permit Number - TC-MDP-0223-00512
Permit Status: Complete
Permit Description: SFR MER1502580 T21-M0076
Start Date Submittal Complete Date Status  
05/10/2023 RESIDENTIAL NEW DWELLING v.1 05/15/2023 APPROVED Review Details
04/05/2023 RESIDENTIAL NEW DWELLING v.1 04/11/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00512
Permit Status: Complete
Permit Description: SFR MER1502580 T21-M0076
Date Description Comments
04/10/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
04/05/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/05/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
04/05/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/05/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/10/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00512
Permit Description: SFR MER1502580 T21-M0076
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/23/2023 COT - RSPL - Rough Soil Passed
05/23/2023 COT - RSPL - Yard Water Line Passed
06/02/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
06/02/2023 COT - RSBU - Preslab Passed
06/02/2023 COT - RSEL - Electrical Underground Passed
06/02/2023 COT - RSEL - Grounding/Bonding Passed
06/26/2023 COT - RSBU - Exterior Clips/Sheathing Passed
06/26/2023 COT - RSBU - Roof Nailing Passed
07/28/2023 RSBU - Building Progress Passed
07/28/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/28/2023 COT - RSPL - Gas Pressure Test Passed
07/28/2023 BULD - Electrical Clearance Passed
08/14/2023 COT - RSBU - Interior Shear Bracing Passed
11/14/2023 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 11/14/2023
11/14/2023 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 11/14/2023
11/22/2023 ENGR Engineering Final Passed gate to back not installed
11/22/2023 RSBU - Building Final Passed
11/22/2023 COT - RSEL - Electrical Final Passed
11/22/2023 COT - RSEL - Outdoor Lighting Passed
11/22/2023 COT - RSME - Mechanical Final Passed
11/22/2023 COT - RSPL - Gas Final Passed
11/22/2023 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
LOT 145 CORRECTED PLOT PLAN_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 145 SPECIAL INSPECTION CERTIFICATE-2023-03-30_V1.PDF DOCUMENTS VIEW
LOT 145 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 145 PLOT PLAN_V1.PDF DOCUMENTS VIEW