Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
04/18/2023
Applicant:
Daria Hopkins
Description:
SFR MERI192021 T21-M0064

Permit Reviews

Permit Number - TC-MDP-0223-00496
Permit Status: Complete
Permit Description: SFR MERI192021 T21-M0064
Start Date Submittal Complete Date Status  
04/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/17/2024 APPROVED Review Details
04/19/2023 RESIDENTIAL NEW DWELLING v.1 04/25/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00496
Permit Status: Complete
Permit Description: SFR MERI192021 T21-M0064
Date Description Comments
04/19/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
04/19/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/19/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/17/2024 Post-Tension Inspection Report is required.
04/19/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/19/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/19/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00496
Permite Description: SFR MERI192021 T21-M0064
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
11/07/2023 COT - RSPL - Gas Final N/A Not Ready
11/07/2023 COT - RSPL - Plumbing Final N/A Re-inspection required Appliances are not installed. Trim condensation pipe 6" from the ground. Missing a buried receptacle at foyer area. 15 amp Breaker not labeled. Provide ladder for attic access. 11/7/2023
11/07/2023 COT - RSEL - Electrical Final N/A Re-inspection required Appliances are not installed. Trim condensation pipe 6" from the ground. Missing a buried receptacle at foyer area. 15 amp Breaker not labeled. Provide ladder for attic access. 11/7/2023
11/07/2023 RSBU - Building Final N/A Re-inspection required Appliances are not installed. Trim condensation pipe 6" from the ground. Missing a buried receptacle at foyer area. 15 amp Breaker not labeled. Provide ladder for attic access. 11/7/2023

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00496
Permit Description: SFR MERI192021 T21-M0064
Total Completed Inspections - 23
Date Description Inspector Results Comments
06/17/2023 COT - RSPL - Backwater Valve Passed
06/17/2023 COT - RSPL - Yard Water Line Passed
06/17/2023 COT - RSPL - Sewer Passed
06/17/2023 COT - RSPL - Rough Soil Passed
06/28/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar reinforcement is in place at footings. Post tension cables are installed per plans. Shear wall braces and base plate clips are installed per plans. Okay to pour concrete for footings and slab on grade.
06/28/2023 COT - RSBU - Preslab Passed Rebar reinforcement is in place at footings. Post tension cables are installed per plans. Shear wall braces and base plate clips are installed per plans. Okay to pour concrete for footings and slab on grade.
06/28/2023 COT - RSEL - Electrical Underground Passed Ufer ground is in place within footing. Okay to pour concrete footing and slab on grade.
06/28/2023 COT - RSEL - Grounding/Bonding Passed Ufer ground is in place within footing. Okay to pour concrete footing and slab on grade.
07/14/2023 COT - RSBU - Exterior Clips/Sheathing Passed
07/14/2023 COT - RSBU - Roof Nailing Passed
08/22/2023 COT - RSPL - Gas Pressure Test Passed
08/22/2023 BULD - Electrical Clearance Passed
08/23/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/12/2023 COT - RSBU - Interior Shear Bracing Passed
10/25/2023 COT - BULD - SWG Clearance Passed Approved, SWG Clearance is required for the new meter connection
11/07/2023 COT - RSEL - Outdoor Lighting Passed
11/07/2023 COT - RSME - Mechanical Final Passed
11/15/2023 COT - RSPL - Gas Final Passed
11/15/2023 COT - RSPL - Plumbing Final Passed
11/15/2023 COT - RSEL - Electrical Final Passed
11/15/2023 RSBU - Building Final Passed
04/16/2024 RSBU - Building Progress Passed
04/16/2024 ENGR Engineering Final Passed Occupied home,
Grade appears to be correct but could not enter back yard or open panel to check for cert.
Clean out pipes are creating a trip hazard in front yard.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 88 FINAL SPECIAL INSPECTION CERTIFICATE-2024-04-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 88 SPECIAL INSPECTION CERTIFICATE-2023-04-18_V1.PDF DOCUMENTS VIEW
LOT 88 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 88 PLOT PLAN_V1.PDF DOCUMENTS VIEW