Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
04/14/2023
Applicant:
Daria Hopkins
Description:
SFR MERI192021 T21-M0064

Permit Reviews

Permit Number - TC-MDP-0223-00495
Permit Status: Complete
Permit Description: SFR MERI192021 T21-M0064
Start Date Submittal Complete Date Status  
04/18/2023 RESIDENTIAL NEW DWELLING v.1 04/25/2023 APPROVED Review Details
06/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/14/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00495
Permit Status: Complete
Permit Description: SFR MERI192021 T21-M0064
Date Description Comments
05/10/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/10/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/14/2024 Post-Tension Inspection Report is required.
04/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/10/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/10/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/10/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00495
Permite Description: SFR MERI192021 T21-M0064
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/27/2024 ENGR Engineering Final N/A Partial Pass Grade cert. was never completed
Grade between 4875 and 4871 is flat with no berm present.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00495
Permit Description: SFR MERI192021 T21-M0064
Total Completed Inspections - 22
Date Description Inspector Results Comments
06/05/2023 COT - RSPL - Yard Water Line Passed
06/05/2023 COT - RSPL - Rough Soil Passed
06/05/2023 COT - RSPL - Sewer Passed
06/13/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
06/13/2023 COT - RSBU - Preslab Passed
06/13/2023 COT - RSEL - Electrical Underground Passed
06/13/2023 COT - RSEL - Grounding/Bonding Passed
06/29/2023 COT - RSBU - Exterior Clips/Sheathing Passed Missing some anchor bolts marked in red, one masa click,at entrance not stapled will check at intermediate
06/29/2023 COT - RSBU - Roof Nailing Passed
07/25/2023 COT - RSPL - Gas Pressure Test Passed
08/02/2023 BULD - Electrical Clearance Passed
08/02/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/17/2023 COT - RSBU - Interior Shear Bracing Passed
10/13/2023 COT - BULD - SWG Clearance Passed
10/19/2023 COT - RSEL - Electrical Final Passed
10/19/2023 COT - RSEL - Outdoor Lighting Passed
10/19/2023 COT - RSME - Mechanical Final Passed
10/19/2023 COT - RSPL - Gas Final Passed
10/19/2023 COT - RSPL - Plumbing Final Passed
10/23/2023 RSBU - Building Final Passed
03/27/2024 RSBU - Building Progress Passed
06/13/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 83 FINAL SPECIAL INSPECTION CERTIFICATE-2024-06-13_V1.PDF DOCUMENTS VIEW
VALENCIA CROSSING PHASE 1 PUBLIC SEWER G-2021-022-P21WP0021 ACCEPTANCE LETTER_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 83 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 83 SPECIAL INSPECTION CERTIFICATE-2023-04-14_V1.PDF DOCUMENTS VIEW
LOT 83 APPLICATION_V1.PDF DOCUMENTS VIEW