Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/03/2023
Applicant:
Daria Hopkins
Description:
SFR MERI132021 T21-M0062

Permit Reviews

Permit Number - TC-MDP-0223-00480
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Start Date Submittal Complete Date Status  
06/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/20/2024 APPROVED Review Details
01/16/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/18/2024 APPROVED Review Details
03/09/2023 RESIDENTIAL NEW DWELLING v.1 03/14/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00480
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Date Description Comments
03/13/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
01/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/13/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/13/2023 Post-Tension Inspection Report is required.
06/18/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
01/18/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/13/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00480
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/20/2023 COT - RSPL - Sewer Passed
04/20/2023 COT - RSPL - Yard Water Line Passed
04/28/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
04/28/2023 COT - RSBU - Preslab Passed
04/28/2023 COT - RSEL - Electrical Underground Passed
04/28/2023 COT - RSEL - Grounding/Bonding Passed
04/28/2023 COT - RSPL - Rough Soil Passed Pass per Gustavo. 4/28/2023
05/09/2023 COT - RSBU - Roof Nailing Passed
05/10/2023 COT - RSBU - Exterior Clips/Sheathing Passed
05/31/2023 BULD - Electrical Clearance Passed
06/02/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/02/2023 COT - RSPL - Gas Pressure Test Passed
06/13/2023 COT - RSBU - Interior Shear Bracing Passed
07/27/2023 COT - RSPL - Gas Final Passed Swg clearance for meter only.
08/04/2023 COT - BULD - SWG Clearance Passed Swg clearance for meter only.
08/15/2023 COT - RSPL - Plumbing Final Passed
08/15/2023 COT - RSEL - Electrical Final Passed
08/15/2023 COT - RSEL - Outdoor Lighting Passed
08/15/2023 RSBU - Building Final Passed
08/16/2023 COT - RSME - Mechanical Final Passed
06/18/2024 RSBU - Building Progress Passed
06/18/2024 COT - RSPL - Backwater Valve Passed Approved per Gustavo back in APRIL. 6/18/2024

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 29 FINAL SPECIAL INSPECTION CERTIFICATE-2024-06-17_V1.PDF DOCUMENTS VIEW
LOT 29 FINAL SPECIAL INSPECTION CERT-2024-01-13_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 29 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 29 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 29 SPECIAL INSPECTION CERTIFICATE-2023-03-07_V1.PDF DOCUMENTS VIEW