Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/08/2023
Applicant:
Daria Hopkins
Description:
SFR 230.2690 T21-M0027

Permit Reviews

Permit Number - TC-MDP-0223-00437
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
Start Date Submittal Complete Date Status  
06/03/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/03/2024 APPROVED Review Details
05/30/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/03/2024 APPROVED Review Details
06/08/2023 RESIDENTIAL NEW DWELLING v.1 06/12/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00437
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
Date Description Comments
06/09/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/08/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/31/2024 Post-Tension Inspection Report is required.
06/08/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/08/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/09/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00437
Permite Description: SFR 230.2690 T21-M0027
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/04/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass 12-4-23: Partial Pass--Mechanical and plumbing are complete. Still need plan revision for garage lighting circuit and install 12 gauge wire for all exterior outlets, including the equipment service outlet.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00437
Permit Description: SFR 230.2690 T21-M0027
Total Completed Inspections - 22
Date Description Inspector Results Comments
08/25/2023 COT - RSPL - Rough Soil Passed
08/25/2023 COT - RSPL - Sewer Passed
08/25/2023 COT - RSPL - Yard Water Line Passed
09/12/2023 COT - RSBU - Preslab Passed
09/12/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/12/2023 COT - RSEL - Electrical Underground Passed
09/12/2023 COT - RSEL - Grounding/Bonding Passed
10/09/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/09/2023 COT - RSBU - Roof Nailing Passed
11/30/2023 BULD - Electrical Clearance Passed 1/12/24 clerance resent
11/30/2023 COT - RSPL - Gas Pressure Test Passed
12/08/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/28/2023 COT - RSBU - Interior Shear Bracing Passed
02/20/2024 COT - BULD - SWG Clearance Passed
03/04/2024 ENGR Engineering Final Passed
03/04/2024 RSBU - Building Progress Passed
03/04/2024 RSBU - Building Final Passed Passed but waiting on engineer final
03/04/2024 COT - RSEL - Electrical Final Passed
03/04/2024 COT - RSEL - Outdoor Lighting Passed
03/04/2024 COT - RSME - Mechanical Final Passed
03/04/2024 COT - RSPL - Gas Final Passed
05/30/2024 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 121 FINAL SIC WITH REPORTS-2024-06-03_V1.PDF DOCUMENTS VIEW
LA ESTANCIA DE TUCSON PHASE II HOMESTEAD III 40S FINAL SIC - LOT 121-2024-05-30_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 121 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 121 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 121 SPECIAL INSPECTION CERTIFICATE-2023-06-08_V1.PDF DOCUMENTS VIEW