Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0223-00423
Permit Details
Apply Date:
02/03/2023
Applicant:
Daria Hopkins
Description:
SFR MER1301460 T21-M0072
Permit Reviews
Permit Number - TC-MDP-0223-00423
Permit Status: Complete
Permit Description: SFR MER1301460 T21-M0072
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/21/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/24/2023 | APPROVED |
01/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/25/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0223-00423
Permit Status: Complete
Permit Description: SFR MER1301460 T21-M0072
Date | Description | Comments |
---|---|---|
03/22/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
03/22/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/22/2023 | Post-Tension Inspection Report is required. | |
03/22/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00423
Permite Description: SFR MER1301460 T21-M0072
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/21/2023 | ENGR Engineering Final | N/A | Partial Pass | inspected lots 32-38 driveway grades and drainage. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00423
Permit Description: SFR MER1301460 T21-M0072
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/25/2023 | COT - RSPL - Rough Soil | Passed | ||
04/25/2023 | COT - RSPL - Sewer | Passed | ||
04/25/2023 | COT - RSPL - Yard Water Line | Passed | ||
05/03/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
05/03/2023 | COT - RSEL - Electrical Underground | Passed | ||
05/03/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
05/03/2023 | COT - RSBU - Preslab | Passed | ||
05/18/2023 | COT - RSBU - Roof Nailing | Passed | ||
06/13/2023 | BULD - Electrical Clearance | Passed | TEP eco | |
06/13/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
06/14/2023 | RSBU - Building Progress | Passed | Electrical, mechanical, and plumbing rough-in is complete. Okay to insulate, drywall, tape, & texture walls and ceilings. | |
06/14/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | 6-14-23: Completed by Ernie on 5-18-23. | |
06/14/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6-14-23: Contractor has installed blocking around register in kitchen, strapped condensation line to studs and rafters, attic exhaust fan has been installed. Okay to insulate, drywall, tape, & texture interior walls and ceilings. | |
06/23/2023 | COT - RSBU - Interior Shear Bracing | Passed | pass | |
08/03/2023 | COT - BULD - SWG Clearance | Passed | ||
08/18/2023 | COT - RSPL - Gas Final | Passed | ||
08/21/2023 | RSBU - Building Final | Passed | ||
08/21/2023 | COT - RSEL - Electrical Final | Passed | ||
08/21/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/21/2023 | COT - RSME - Mechanical Final | Passed | ||
08/21/2023 | COT - RSPL - Plumbing Final | Passed | ||
01/19/2024 | ENGR Engineering Final | Passed |