Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/03/2023
Applicant:
Description:
SFR MER1301460 T21-M0072

Permit Reviews

Permit Number - TC-MDP-0223-00423
Permit Status: Complete
Permit Description: SFR MER1301460 T21-M0072
Start Date Submittal Complete Date Status  
03/21/2023 RESIDENTIAL NEW DWELLING v.1 03/24/2023 APPROVED Review Details
01/25/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/25/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00423
Permit Status: Complete
Permit Description: SFR MER1301460 T21-M0072
Date Description Comments
03/22/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
03/22/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/22/2023 Post-Tension Inspection Report is required.
03/22/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00423
Permite Description: SFR MER1301460 T21-M0072
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/21/2023 ENGR Engineering Final N/A Partial Pass inspected lots 32-38 driveway grades and drainage.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00423
Permit Description: SFR MER1301460 T21-M0072
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/25/2023 COT - RSPL - Rough Soil Passed
04/25/2023 COT - RSPL - Sewer Passed
04/25/2023 COT - RSPL - Yard Water Line Passed
05/03/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
05/03/2023 COT - RSEL - Electrical Underground Passed
05/03/2023 COT - RSEL - Grounding/Bonding Passed
05/03/2023 COT - RSBU - Preslab Passed
05/18/2023 COT - RSBU - Roof Nailing Passed
06/13/2023 BULD - Electrical Clearance Passed TEP eco
06/13/2023 COT - RSPL - Gas Pressure Test Passed
06/14/2023 RSBU - Building Progress Passed Electrical, mechanical, and plumbing rough-in is complete. Okay to insulate, drywall, tape, & texture walls and ceilings.
06/14/2023 COT - RSBU - Exterior Clips/Sheathing Passed 6-14-23: Completed by Ernie on 5-18-23.
06/14/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6-14-23: Contractor has installed blocking around register in kitchen, strapped condensation line to studs and rafters, attic exhaust fan has been installed. Okay to insulate, drywall, tape, & texture interior walls and ceilings.
06/23/2023 COT - RSBU - Interior Shear Bracing Passed pass
08/03/2023 COT - BULD - SWG Clearance Passed
08/18/2023 COT - RSPL - Gas Final Passed
08/21/2023 RSBU - Building Final Passed
08/21/2023 COT - RSEL - Electrical Final Passed
08/21/2023 COT - RSEL - Outdoor Lighting Passed
08/21/2023 COT - RSME - Mechanical Final Passed
08/21/2023 COT - RSPL - Plumbing Final Passed
01/19/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
140179 PT LOT 36 COMPLETE-2024-01-25_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 36 APPLICATION_V1.PDF DOCUMENTS VIEW