Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0223-00421
Permit Details
Apply Date:
01/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301460 T21-M0072
Permit Reviews
Permit Number - TC-MDP-0223-00421
Permit Status: Complete
Permit Description: SFR MER1301460 T21-M0072
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/26/2024 | APPROVED |
01/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/11/2024 | APPROVED |
06/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/14/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0223-00421
Permit Status: Complete
Permit Description: SFR MER1301460 T21-M0072
Date | Description | Comments |
---|---|---|
01/05/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
01/05/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/05/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/09/2024 | Post-Tension Inspection Report is required. | |
01/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/14/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
01/09/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00421
Permite Description: SFR MER1301460 T21-M0072
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/06/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | 6/6/24: receptacle or breaker needs to be GFCI protected. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00421
Permit Description: SFR MER1301460 T21-M0072
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/22/2024 | COT - RSPL - Rough Soil | Passed | ||
04/22/2024 | COT - RSPL - Sewer | Passed | ||
05/01/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
05/01/2024 | COT - RSBU - Preslab | Passed | ||
05/01/2024 | COT - RSEL - Electrical Underground | Passed | ||
05/01/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
05/01/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/17/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior wall sheathing is properly installed and secured to the studs per plans and code. Bottom plates are secured to the concrete floor with masa clips or a/b bolts. Shear wall clips are properly secured to studs with nails and all large headers are properly secured with straps and nails. Okay to proceed. | |
05/17/2024 | COT - RSBU - Roof Nailing | Passed | All trusses are properly secured to top plate with nails and H2.5 clips. All plywood sheathing is properly secured to trusses with nails per plans and code. Okay to proceed. | |
06/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
06/06/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
06/11/2024 | BULD - Electrical Clearance | Passed | ||
07/05/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/05/2024 | COT - RSPL - Backwater Valve | Passed | ||
08/08/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
08/21/2024 | COT - RSEL - Electrical Final | Passed | ||
08/21/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
08/21/2024 | COT - RSME - Mechanical Final | Passed | ||
08/21/2024 | COT - RSPL - Plumbing Final | Passed | ||
08/21/2024 | RSBU - Building Progress | Passed | ||
09/11/2024 | ENGR Engineering Final | Passed | ||
09/11/2024 | RSBU - Building Final | Passed |