Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0223-00413
Permit Details
Apply Date:
11/16/2023
Applicant:
Daria Hopkins
Description:
SFR 130.1460 T21-M0026
Permit Reviews
Permit Number - TC-MDP-0223-00413
Permit Status: Complete
Permit Description: SFR 130.1460 T21-M0026
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/16/2023 | RESIDENTIAL NEW DWELLING v.1 | 11/22/2023 | APPROVED |
09/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/26/2024 | APPROVED |
03/28/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/28/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0223-00413
Permit Status: Complete
Permit Description: SFR 130.1460 T21-M0026
Date | Description | Comments |
---|---|---|
03/28/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
11/16/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
11/16/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
11/17/2023 | Post-Tension Inspection Report is required. | |
11/16/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
09/25/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
03/28/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
11/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00413
Permit Description: SFR 130.1460 T21-M0026
Total Completed Inspections - 21