Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/05/2024
Applicant:
Daria Hopkins
Description:
SFR 130.1460 T21-M0026

Permit Reviews

Permit Number - TC-MDP-0223-00410
Permit Status: Complete
Permit Description: SFR 130.1460 T21-M0026
Start Date Submittal Complete Date Status  
10/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/10/2024 APPROVED Review Details
07/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/31/2024 APPROVED Review Details
01/05/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/11/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00410
Permit Status: Complete
Permit Description: SFR 130.1460 T21-M0026
Date Description Comments
01/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/09/2024 Post-Tension Inspection Report is required.
01/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
01/09/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00410
Permit Description: SFR 130.1460 T21-M0026
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/29/2024 COT - RSPL - Yard Water Line Passed
05/29/2024 COT - RSPL - Sewer Passed
05/29/2024 COT - RSPL - Rough Soil Passed
06/04/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/04/2024 COT - RSBU - Preslab Passed
06/04/2024 COT - RSEL - Electrical Underground Passed
06/04/2024 COT - RSEL - Grounding/Bonding Passed
06/24/2024 COT - RSBU - Roof Nailing Passed
06/24/2024 COT - RSBU - Exterior Clips/Sheathing Passed
07/17/2024 COT - RSPL - Gas Pressure Test Passed
07/19/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/02/2024 COT - RSBU - Interior Shear Bracing Passed
08/02/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 8/2/2024
09/13/2024 COT - BULD - SWG Clearance Passed clearance Southwest Gas 9/13/24
09/18/2024 COT - RSEL - Electrical Final Passed
09/18/2024 COT - RSEL - Outdoor Lighting Passed
09/18/2024 RSBU - Building Progress Passed
09/18/2024 COT - RSPL - Plumbing Final Passed
09/20/2024 ENGR Engineering Final Passed CO ready
10/04/2024 COT - RSME - Mechanical Final Passed
10/04/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
TRUSS DESIGNS_V1.PDF DOCUMENTS VIEW
148050 PT LOT 31 COMPLETE-2024-07-26_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 31 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 31 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 31 SPECIAL INSPECTION CERTIFICATE-2024-01-05_V1.PDF DOCUMENTS VIEW