Permit: TC-MDP-0223-00407
Permit Details
Apply Date:
01/02/2024
Applicant:
Daria Hopkins
Description:
SFR 130.1460 T21-M0026
Permit Reviews
Permit Number - TC-MDP-0223-00407
Permit Status: Complete
Permit Description: SFR 130.1460 T21-M0026
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/29/2024 | APPROVED |
01/02/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/04/2024 | APPROVED |
10/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/18/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0223-00407
Permit Status: Complete
Permit Description: SFR 130.1460 T21-M0026
Date | Description | Comments |
---|---|---|
04/29/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
01/02/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/02/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/03/2024 | Post-Tension Inspection Report is required. | |
01/02/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/02/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
04/29/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00407
Permit Description: SFR 130.1460 T21-M0026
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/07/2024 | COT - RSPL - Rough Soil | Passed | ||
03/07/2024 | COT - RSPL - Yard Water Line | Passed | ||
03/07/2024 | COT - RSPL - Sewer | Passed | ||
03/20/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
03/20/2024 | COT - RSBU - Preslab | Passed | ||
03/20/2024 | COT - RSEL - Electrical Underground | Passed | ||
03/20/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
03/27/2024 | COT - RSBU - Roof Nailing | Passed | ||
04/02/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
04/11/2024 | BULD - Electrical Clearance | Passed | ||
04/11/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
04/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
04/25/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
06/12/2024 | COT - BULD - SWG Clearance | Passed | ||
06/17/2024 | ENGR Engineering Final | Passed | ||
06/18/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
06/18/2024 | RSBU - Building Progress | Passed | ||
06/21/2024 | COT - RSEL - Electrical Final | Passed | Cut clean outs need to be completed and cut to grade. Missing smoke detector in master bedroom. Micro/Exhaust hood/ Range ignition should be on its own circuit. Level out condenser unit. Missing lights or cover plates at kitchen ceiling. 6/18/2024 6/21/24: corrections made. |
|
06/21/2024 | COT - RSME - Mechanical Final | Passed | Cut clean outs need to be completed and cut to grade. Missing smoke detector in master bedroom. Micro/Exhaust hood/ Range ignition should be on its own circuit. Level out condenser unit. Missing lights or cover plates at kitchen ceiling. 6/18/2024 6/21/24: corrections made. |
|
06/21/2024 | COT - RSPL - Plumbing Final | Passed | Cut clean outs need to be completed and cut to grade. Missing smoke detector in master bedroom. Micro/Exhaust hood/ Range ignition should be on its own circuit. Level out condenser unit. Missing lights or cover plates at kitchen ceiling. 6/18/2024 6/21/24: corrections made. |
|
06/21/2024 | RSBU - Building Final | Passed | Cut clean outs need to be completed and cut to grade. Missing smoke detector in master bedroom. Micro/Exhaust hood/ Range ignition should be on its own circuit. Level out condenser unit. Missing lights or cover plates at kitchen ceiling. 6/18/2024 6/21/24: corrections made. |