Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/02/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014

Permit Reviews

Permit Number - TC-MDP-0223-00391
Permit Status: Complete
Permit Description: SFR BT1383-130 T22-M0014
Start Date Submittal Complete Date Status  
02/03/2023 RESIDENTIAL NEW DWELLING v.1 02/07/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0223-00391
Permit Status: Complete
Permit Description: SFR BT1383-130 T22-M0014
Total Outstanding Activity Conditions - 7
Date Name
02/06/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
02/06/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/06/2023 Post-Installed Anchor Inspection Report is required.
02/06/2023 Post-Tension Inspection Report is required.
02/06/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00391
Permite Description: SFR BT1383-130 T22-M0014
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/01/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready Not ready leak at bathtub 1st bathroom. Add nail plates to any line that's less than an 1"1/4. Mostly above top plate. Add fire foam to all top penetrations that have been missed. Add blocking to dead space in pantry. 5/1/2023

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00391
Permit Description: SFR BT1383-130 T22-M0014
Total Completed Inspections - 24

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA - LOT 100 START_V1.PDF DOCUMENTS VIEW
BELLA TIERRA II 100 SIC-2023-02-03_V1.PDF DOCUMENTS VIEW