Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
5958 E BENBURB LN
Apply Date:
01/29/2026
Applicant:
Candis Benson
Description:
New Residential Model Plan (Model master plan TC-MDP-1224-01413) Rev 2

Permit Reviews

Permit Number - TC-MDP-0126-00033
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413) Rev 2
Start Date Submittal Complete Date Status  
02/05/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 02/13/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0126-00033
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413) Rev 2
Total Outstanding Activity Conditions - 3
Date Name
01/30/2026 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/30/2026 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
02/10/2026 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Conditions

Permit Number - TC-MDP-0126-00033
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413) Rev 2
Date Description Comments
01/30/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/30/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0126-00033
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413) Rev 2
Total Completed Inspections - 20
Date Description Inspector Results Comments
02/27/2026 COT - RSPL - Rough Soil Passed 2/27/2026
All fixtures under test with pitch and clean trench. Ok to backfill with shading.
02/27/2026 COT - RSPL - Sewer Passed 2/27/2026
Under test with green tracer to HCS. Ok to backfill with shading.
02/27/2026 COT - RSPL - Yard Water Line Passed
03/09/2026 BULD - Electrical Clearance Passed Approved clearance TEP ECO.
03/09/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 03/09/2026
Approved per site plan, reinforcement details - ok for concrete placement.
03/09/2026 COT - RSBU - Preslab Passed 03/09/2026
Approved per site plan, reinforcement details - ok for concrete placement.
03/09/2026 COT - RSEL - Electrical Underground Passed
03/19/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 3/19/2026
Approved per plan.
03/19/2026 COT - RSBU - Roof Nailing Passed 3/19/2026
Approved per plan and truss calcs.
04/07/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/07/2026 COT - RSPL - Gas Pressure Test Passed
04/15/2026 COT - RSBU - Interior Shear Bracing Passed
05/19/2026 COT - BULD - SWG Clearance Passed 5.19.26
Approved
06/01/2026 ENGR Engineering Final Passed
06/01/2026 COT - RSEL - Electrical Final Passed
06/01/2026 COT - RSEL - Outdoor Lighting Passed
06/01/2026 COT - RSME - Mechanical Final Passed
06/01/2026 COT - RSPL - Plumbing Final Passed
06/01/2026 RSBU - Building Final Passed
06/01/2026 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2026-02-02_V1.PDF DOCUMENTS VIEW