Permit: TC-MDP-0126-00011
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
5943 E BENBURB LN
Address NEW:
5943 E BENBURB LN
Apply Date:
01/29/2026
Applicant:
Candis Benson
Description:
Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385) Rev 1
Permit Reviews
Permit Number - TC-MDP-0126-00011
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385) Rev 1
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/04/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 02/13/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0126-00011
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385) Rev 1
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 01/09/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 02/06/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 02/06/2026 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 02/06/2026 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0126-00011
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385) Rev 1
| Date | Description | Comments |
|---|---|---|
| 01/09/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/09/2026 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 01/09/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0126-00011
Permite Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385) Rev 1
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/02/2026 | COT - RSPL - Rough Soil | N/A | Not Ready | 3/2/2026 Verified holding under test in trench but requires hold release before approval. |
| 03/02/2026 | COT - RSPL - Sewer | N/A | Not Ready | 3/2/2026 Verified holding under test in trench to HCS but requires hold release before approval. |
| 03/02/2026 | COT - RSPL - Yard Water Line | N/A | Not Ready | 3/2/2026 Verified holding under test in trench but requires hold release before approval. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0126-00011
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385) Rev 1
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/09/2026 | COT - RSPL - Rough Soil | Passed | 03/09/2026 Holding under test - ok to backfill with shading. |
|
| 03/09/2026 | COT - RSPL - Sewer | Passed | 03/09/2026 Holding under test - ok to backfill with shading. |
|
| 03/09/2026 | COT - RSPL - Yard Water Line | Passed | 03/09/2026 Holding under test - ok to backfill with shading. |
|
| 03/13/2026 | BULD - Electrical Clearance | Passed | 03/13/2026 Clearance TEP ECO. |
|
| 03/13/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 03/13/2026 Approved per site plan setbacks, rebar and foundation details. Okay to put concrete. |
|
| 03/13/2026 | COT - RSBU - Preslab | Passed | 03/13/2026 Approved per site plan setbacks, rebar and foundation details. Okay to put concrete. |
|
| 03/13/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 03/26/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/26/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 04/13/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 04/13/2026 Approved per plan. |
|
| 04/13/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 04/24/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/02/2026 | COT - BULD - SWG Clearance | Passed | 6.2.26 Approved for SWG |
|
| 06/08/2026 | COT - RSEL - Electrical Final | Passed | ||
| 06/08/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/08/2026 | COT - RSME - Mechanical Final | Passed | ||
| 06/08/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 06/08/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 06/08/2026 | RSBU - Building Final | Passed | ||
| 06/08/2026 | RSBU - Building Progress | Passed |