Permit: TC-MDP-0125-00060
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
3229 N MOUNTAIN AV UNIT 1
Address NEW:
3229 N MOUNTAIN AV UNIT 1
Apply Date:
01/29/2025
Applicant:
CHARLES ELMER
Description:
model Plan Alum 1585R (Model master plan TC-MDP-1222-00047)
Permit Reviews
Permit Number - TC-MDP-0125-00060
Permit Status: Complete
Permit Description: model Plan Alum 1585R (Model master plan TC-MDP-1222-00047)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/30/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 02/14/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0125-00060
Permit Status: Complete
Permit Description: model Plan Alum 1585R (Model master plan TC-MDP-1222-00047)
| Date | Description | Comments |
|---|---|---|
| 01/28/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/12/2025 | Per TC-BCA-0125-00008: Recorded Joint Use Sewer Agreement required for submittal and approval prior to issuance of the building permit associated with this address. | |
| 07/31/2025 | Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit. | |
| 01/28/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/30/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0125-00060
Permite Description: model Plan Alum 1585R (Model master plan TC-MDP-1222-00047)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | |
| 11/13/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 11/13/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0125-00060
Permit Description: model Plan Alum 1585R (Model master plan TC-MDP-1222-00047)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/04/2025 | COT - RSPL - Rough Soil | Passed | ||
| 03/24/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 03/24/2025 | COT - RSBU - Preslab and floodplain | Passed | Ensure slab area is termite treated | |
| 03/24/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/07/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 04/07/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/28/2025 | BULD - Electrical Clearance | Passed | ||
| 06/13/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 06/20/2025 | COT - RSPL - Sewer | Passed | 6-20-25: sewer connection verified under test. Okay to backfill with shading materials. | |
| 07/01/2025 | COT - RSPL - Yard Water Line | Passed | 7/1/25 passed ok to backfill | |
| 08/01/2025 | RSBU - Building Final | Passed | Passed final 8/1/25 | |
| 08/01/2025 | ENGR Engineering Final | Passed | Site is clean and accessible. Everything is complete to approved plans. | |
| 08/01/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 8/1/25 | |
| 08/01/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 8/1/25 | |
| 08/01/2025 | COT - RSEL - Electrical Final | Passed | Passed final 8/1/25 | |
| 08/01/2025 | COT - RSME - Mechanical Final | Passed | Passed final 8/1/25 | |
| 11/13/2025 | RSBU - Building Progress | Passed |