Permit Details

Status:
Issued
Type:
Model Building Permit
Address NEW:
9858 E GRAY HAWK DR
Apply Date:
01/23/2025
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)

Permit Reviews

Permit Number - TC-MDP-0125-00058
Permit Status: Issued
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
Start Date Submittal Complete Date Status  
09/12/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/12/2025 REQUIRES RESUBMIT Review Details
01/29/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/05/2025 APPROVED Review Details
09/26/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 09/26/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0125-00058
Permit Status: Issued
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
Total Outstanding Activity Conditions - 1
Date Name
01/28/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-0125-00058
Permit Status: Issued
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
Date Description Comments
01/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/29/2025 Post-Installed Anchor Inspection Report is required.
01/29/2025 Post-Tension Inspection Report is required.
01/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/29/2025 Soils Testing Special Inspection Required.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0125-00058
Permite Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/21/2025 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required Electrical conduit exposed, clean and verify footings at se section of house, clean loose degree from ufer trench

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0125-00058
Permit Description: Casas del Cerrito H35G Model Plan (Model master plan TC-MDP-0823-01442)
Total Completed Inspections - 20
Date Description Inspector Results Comments
07/10/2025 COT - RSPL - Rough Soil Passed Passed 7/10/25 ok to backfill with shading material
07/10/2025 COT - RSPL - Sewer Passed Passed 7/10/25 ok to backfill with shading material
07/10/2025 COT - RSPL - Yard Water Line Passed Passed 7/10/25 ok to backfill with shading material
07/21/2025 BULD - Electrical Clearance Passed Passed 7/21/25 ready for temp power clearance ECO
07/21/2025 COT - RSBU - Preslab Passed Electrical conduit exposed, clean and verify footings at se section of house, clean loose degree from ufer trench
07/21/2025 COT - RSEL - Grounding/Bonding Passed Passed 7/21/25 ready for temp power clearance ECO
07/29/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
07/29/2025 COT - RSBU - Roof Nailing Passed
08/11/2025 COT - RSPL - Gas Pressure Test Passed
08/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/20/2025 COT - RSBU - Interior Shear Bracing Passed 8.20.25
APPROVED
09/16/2025 COT - BULD - SWG Clearance Passed Passed CLEARANCE SWG 9/16/25
09/19/2025 COT - RSME - Mechanical Final Passed 9.19.25
APPROVED
09/19/2025 RSBU - Building Final Passed 9.19.25
APPROVED
09/19/2025 ENGR Engineering Final Passed
09/19/2025 COT - RSEL - Outdoor Lighting Passed 9.19.25
APPROVED
09/19/2025 COT - RSEL - Electrical Underground Passed
09/19/2025 COT - RSPL - Plumbing Final Passed 9.19.25
APPROVED
09/19/2025 RSBU - Building Progress Passed
09/19/2025 COT - RSEL - Electrical Final Passed 9.19.25
APPROVED

Documents

File Name Document Type  
CDC 23 PAD CERT_V2_V1.PDF DOCUMENTS VIEW
CDC 23 SIC-2025-09-26_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 23 D1_V1.PDF DOCUMENTS VIEW
CDC 23 SIC-2025-01-28_V1.PDF DOCUMENTS VIEW