Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
247 N SIERRA VISTA DR
Apply Date:
01/23/2025
Applicant:
Eric Nickerson
Description:
Two Bedroom ADU Model Plan (Model master plan TC-MDP-1124-01314)

Permit Reviews

Permit Number - TC-MDP-0125-00057
Permit Status: Inspections
Permit Description: Two Bedroom ADU Model Plan (Model master plan TC-MDP-1124-01314)
Start Date Submittal Complete Date Status  
02/20/2025 RESTAMP - RESIDENTIAL v.1 02/21/2025 APPROVED Review Details
02/20/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 02/20/2025 APPROVED Review Details
01/29/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 02/13/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0125-00057
Permit Status: Inspections
Permit Description: Two Bedroom ADU Model Plan (Model master plan TC-MDP-1124-01314)
Date Description Comments
02/20/2025 Documents will need to be resubmitted showing what unit the permit is for and the plans will need to be adjusted to show which building is unit 1 and unit 2. Also you will need to do an address change request to reflect which unit the ADU is. building_official@tucsonaz.gov
01/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0125-00057
Permite Description: Two Bedroom ADU Model Plan (Model master plan TC-MDP-1124-01314)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/03/2025 COT - RSEL - Electrical Underground N/A Partial Pass Two inch conduit from house panel to ADU sub-panel area. OK to cover progress areas.
12/09/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0125-00057
Permit Description: Two Bedroom ADU Model Plan (Model master plan TC-MDP-1124-01314)
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/29/2025 COT - RSPL - Yard Water Line Passed Domestic water line in place.
08/29/2025 COT - RSPL - Sewer Passed Waste line (4”) connected to existing main sewer line. Ok to cover progress area.
08/29/2025 COT - RSBU - Stem Wall/Retaining Wall Passed
09/09/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
09/09/2025 COT - RSBU - Preslab Passed
09/09/2025 COT - RSPL - Rough Soil Passed
11/26/2025 COT - RSBU - Roof Nailing Passed
12/09/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/09/2025 COT - RSBU - Interior Shear Bracing Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-GUTRUF-SITE 1-20-25_V2.PDF DOCUMENTS VIEW