Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
5930 E JAYDEN LN
Address NEW:
5930 E JAYDEN LN
Apply Date:
01/21/2025
Applicant:
Candis Benson
Description:
Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)

Permit Reviews

Permit Number - TC-MDP-0125-00048
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Start Date Submittal Complete Date Status  
03/21/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/01/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0125-00048
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Outstanding Activity Conditions - 5
Date Name
01/28/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
03/25/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/25/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/25/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/25/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0125-00048
Permit Status: Inspections complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Date Description Comments
01/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
03/25/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
03/25/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0125-00048
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385)
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/24/2025 COT - RSPL - Backwater Valve Passed 4-24-25, plumbing underground & backwater valve inspection approved. Okay to backfill with shading materials.
04/24/2025 COT - RSPL - Rough Soil Passed 4-24-25, plumbing underground inspection approved. Okay to backfill with shading materials.
04/24/2025 COT - RSPL - Sewer Passed 4-24-25, sewer, plumbing underground & backwater valve inspection approved. Okay to backfill with shading materials.
04/24/2025 COT - RSPL - Yard Water Line Passed 4-24-25, main water line inspection approved. Okay to backfill with shading materials.
04/30/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
04/30/2025 COT - RSBU - Preslab Passed 4/30/25: PRESLAB PER PLANS OK to proceed with concrete placement,
04/30/2025 COT - RSEL - Electrical Underground Passed
04/30/2025 COT - RSEL - Grounding/Bonding Passed 4/30/25: PRESLAB PER PLANS OK to proceed with concrete placement,
04/30/2025 BULD - Electrical Clearance Passed 4/30/25: ECO
05/08/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/08/2025 COT - RSBU - Roof Nailing Passed
05/27/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5-27-25, intermediates approved. Okay to continue with construction.
05/27/2025 COT - RSPL - Gas Pressure Test Passed 5-27-25, gas pressure test approved.
06/04/2025 COT - RSBU - Interior Shear Bracing Passed 6-4-25: interior shear wall approved. Okay to tape and texture.
07/10/2025 COT - BULD - SWG Clearance Passed 7-10-25: okay to install meter. Clearance issued to SWG.
07/17/2025 COT - RSEL - Electrical Final Passed Passed final 7/17/25
07/17/2025 COT - RSEL - Outdoor Lighting Passed Passed final 7/17/25
07/17/2025 COT - RSME - Mechanical Final Passed Passed final 7/17/25
07/17/2025 COT - RSPL - Plumbing Final Passed Passed final 7/17/25
07/17/2025 ENGR Engineering Final Passed Site is clean and safe. Everything is in accordance with approved plans.
07/17/2025 RSBU - Building Progress Passed Passed final 7/17/25
07/17/2025 RSBU - Building Final Passed Passed final 7/17/25

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-03-18_V1.PDF DOCUMENTS VIEW