Permit: TC-MDP-0125-00043
Permit Details
Apply Date:
01/30/2025
Applicant:
Ramon VALDEZ
Description:
DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)
Permit Reviews
Permit Number - TC-MDP-0125-00043
Permit Status: Complete
Permit Description: DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/31/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 02/18/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0125-00043
Permit Status: Complete
Permit Description: DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)
| Date | Description | Comments |
|---|---|---|
| 01/28/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 01/28/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0125-00043
Permite Description: DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2025 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 3/10/25: footers depth not per approved plans, Gray water must terminate 24" above Finish grade. |
| 03/10/2025 | COT - RSBU - Preslab | N/A | Re-inspection required | 3/10/25: footers depth not per approved plans, Gray water must terminate 24" above Finish grade. |
| 03/10/2025 | COT - RSEL - Grounding/Bonding | N/A | Re-inspection required | 3/10/25: footers depth not per approved plans, Gray water must terminate 24" above Finish grade. |
| 04/01/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 4/1/25: exterior sheathing must be fastened 6"o.c at edge and field, H2.5 missing at north unit east wall ( marked on wall), common wall must be framed per approved plans, anchor bolts required 32" o.c at common wall. |
| 04/01/2025 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Re-inspection required | 4/1/25: exterior sheathing must be fastened 6"o.c at edge and field, H2.5 missing at north unit east wall ( marked on wall), common wall must be framed per approved plans, anchor bolts required 32" o.c at common wall. |
| 04/01/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 4/1/25: exterior sheathing must be fastened 6"o.c at edge and field, H2.5 missing at north unit east wall ( marked on wall), common wall must be framed per approved plans, anchor bolts required 32" o.c at common wall. |
| 06/13/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | |
| 06/13/2025 | COT - RSEL - Electrical Underground | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0125-00043
Permit Description: DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2025 | COT - RSPL - Rough Soil | Passed | 3/7/25: plumbing underground per plans ok to proceed with backfill. Shading required | |
| 03/12/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 3/12/25 corrections made | |
| 03/12/2025 | COT - RSBU - Preslab | Passed | 3/12/25 corrections made | |
| 03/12/2025 | COT - RSEL - Grounding/Bonding | Passed | 3/12/25 corrections made | |
| 04/02/2025 | BULD - Electrical Clearance | Passed | 2 April 25 TEP ELECTRICAL CLEARANCE: ECO |
|
| 04/02/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/02/2025 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 04/02/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/02/2025 | COT - RSBU - Roof Nailing | Passed | 2 April 25 Pass |
|
| 04/14/2025 | COT - RSPL - Sewer | Passed | 4-14-25, sewer connection approved. Okay to backfill with shading materials. | |
| 06/13/2025 | COT - RSEL - Electrical Final | Passed | ||
| 06/13/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/13/2025 | COT - RSME - Mechanical Final | Passed | ||
| 06/13/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 06/13/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 06/13/2025 | RSBU - Building Final | Passed | ||
| 06/16/2025 | ENGR Engineering Final | Passed | Concrete driveway apron added per plans. Site is in accordance with approved plans. CofO ready. |