Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
1867 W AJO WY
Address NEW:
1867 W AJO WY
Apply Date:
01/30/2025
Applicant:
Ramon VALDEZ
Description:
DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)

Permit Reviews

Permit Number - TC-MDP-0125-00043
Permit Status: Complete
Permit Description: DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)
Start Date Submittal Complete Date Status  
01/31/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 02/18/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0125-00043
Permit Status: Complete
Permit Description: DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)
Date Description Comments
01/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0125-00043
Permite Description: DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
03/10/2025 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required 3/10/25: footers depth not per approved plans, Gray water must terminate 24" above Finish grade.
03/10/2025 COT - RSBU - Preslab N/A Re-inspection required 3/10/25: footers depth not per approved plans, Gray water must terminate 24" above Finish grade.
03/10/2025 COT - RSEL - Grounding/Bonding N/A Re-inspection required 3/10/25: footers depth not per approved plans, Gray water must terminate 24" above Finish grade.
04/01/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 4/1/25: exterior sheathing must be fastened 6"o.c at edge and field, H2.5 missing at north unit east wall ( marked on wall), common wall must be framed per approved plans, anchor bolts required 32" o.c at common wall.
04/01/2025 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Re-inspection required 4/1/25: exterior sheathing must be fastened 6"o.c at edge and field, H2.5 missing at north unit east wall ( marked on wall), common wall must be framed per approved plans, anchor bolts required 32" o.c at common wall.
04/01/2025 COT - RSBU - Roof Nailing N/A Re-inspection required 4/1/25: exterior sheathing must be fastened 6"o.c at edge and field, H2.5 missing at north unit east wall ( marked on wall), common wall must be framed per approved plans, anchor bolts required 32" o.c at common wall.
06/13/2025 COT - RSBU - Interior Shear Bracing N/A Not Applicable
06/13/2025 COT - RSEL - Electrical Underground N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0125-00043
Permit Description: DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 17
Date Description Inspector Results Comments
03/07/2025 COT - RSPL - Rough Soil Passed 3/7/25: plumbing underground per plans ok to proceed with backfill. Shading required
03/12/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 3/12/25 corrections made
03/12/2025 COT - RSBU - Preslab Passed 3/12/25 corrections made
03/12/2025 COT - RSEL - Grounding/Bonding Passed 3/12/25 corrections made
04/02/2025 BULD - Electrical Clearance Passed 2 April 25
TEP ELECTRICAL CLEARANCE: ECO
04/02/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/02/2025 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
04/02/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/02/2025 COT - RSBU - Roof Nailing Passed 2 April 25
Pass
04/14/2025 COT - RSPL - Sewer Passed 4-14-25, sewer connection approved. Okay to backfill with shading materials.
06/13/2025 COT - RSEL - Electrical Final Passed
06/13/2025 COT - RSEL - Outdoor Lighting Passed
06/13/2025 COT - RSME - Mechanical Final Passed
06/13/2025 COT - RSPL - Plumbing Final Passed
06/13/2025 COT - RSPL - Yard Water Line Passed
06/13/2025 RSBU - Building Final Passed
06/16/2025 ENGR Engineering Final Passed Concrete driveway apron added per plans. Site is in accordance with approved plans. CofO ready.