Permit: TC-MDP-0125-00027
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
7344 S AVENIDA OBELO
Address NEW:
7344 S AVENIDA OBELO
Apply Date:
03/02/2025
Applicant:
Brianna Quiroz
Description:
Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Permit Reviews
Permit Number - TC-MDP-0125-00027
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/07/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/07/2025 | APPROVED |
| 03/07/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/19/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0125-00027
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
| Date | Description | Comments |
|---|---|---|
| 03/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/07/2025 | Post-Installed Anchor Inspection Report is required. | |
| 10/07/2025 | Post-Tension Inspection Report is required. | |
| 01/17/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/17/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/07/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 10/07/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0125-00027
Permite Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 05/06/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 10/21/2025 | RSBU - Building Final | N/A | Partial Pass | House has passed all finals, just need to clear once builder recalls |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0125-00027
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 05/06/2025 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 5/6/2025 | |
| 05/06/2025 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 5/6/2025 | |
| 05/06/2025 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 5/6/2025 | |
| 05/08/2025 | COT - RSBU - Preslab | Passed | ||
| 05/08/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/09/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 6-9-25: exterior clips/sheathing approved. | |
| 06/09/2025 | COT - RSBU - Roof Nailing | Passed | 6-9-25: roof nailing approved. | |
| 07/09/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 7.9.25 Nail plates verified. Lines under test. Pex, flex secured properly. Penetrations are sealed appropriately. Receptacles present per plan and appropriately spaced. Dwv under test. Stair clearance verified. Metallic fixture sights grounded. Fireblocking/firefoam verified. Box fills verified. Cables supported. Smoke alarms per plan. |
|
| 07/09/2025 | COT - RSEL - Grounding/Bonding | Passed | 7.9.25 Grounding and bonding verified per plan |
|
| 07/21/2025 | COT - RSBU - Interior Shear Bracing | Passed | 7-21-25: interior shear bracing approved. Okay for tape & texture. | |
| 07/25/2025 | BULD - Electrical Clearance | Passed | 7.9.25 electrical verified per plan. Deadfront has no missing spaces. Future PV marked. Non metallic labeled at panel. Address label verified. No open knockouts. Grounding/bonding verified. Current present Breakers labeled. Number of circuits per revised plan/letter. 7/25/25: ECO |
|
| 10/20/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. Engineering is good for CofO. | |
| 10/21/2025 | COT - RSEL - Electrical Final | Passed | Passed final 10/21/25 | |
| 10/21/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 10/21/25 | |
| 10/21/2025 | COT - RSME - Mechanical Final | Passed | Passed final 10/21/25 | |
| 10/21/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 10/21/25 | |
| 10/21/2025 | RSBU - Building Progress | Passed | Passed final 10/21/25 | |
| 11/03/2025 | RSBU - Building Final | Passed | 11.03.2025 Builder called in final, passed prior on 10.21.2025. |