Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
7344 S AVENIDA OBELO
Apply Date:
03/02/2025
Applicant:
Brianna Quiroz
Description:
Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)

Permit Reviews

Permit Number - TC-MDP-0125-00027
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Start Date Submittal Complete Date Status  
10/07/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/07/2025 APPROVED Review Details
03/07/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/19/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0125-00027
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Date Description Comments
03/07/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/07/2025 Post-Installed Anchor Inspection Report is required.
10/07/2025 Post-Tension Inspection Report is required.
01/17/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/17/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/07/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
10/07/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0125-00027
Permite Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
05/06/2025 COT - BULD - SWG Clearance N/A Not Applicable
05/06/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
10/21/2025 RSBU - Building Final N/A Partial Pass House has passed all finals, just need to clear once builder recalls

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0125-00027
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/06/2025 COT - RSEL - Electrical Underground Passed
05/06/2025 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 5/6/2025
05/06/2025 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 5/6/2025
05/06/2025 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 5/6/2025
05/08/2025 COT - RSBU - Preslab Passed
05/08/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
06/09/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 6-9-25: exterior clips/sheathing approved.
06/09/2025 COT - RSBU - Roof Nailing Passed 6-9-25: roof nailing approved.
07/09/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7.9.25
Nail plates verified. Lines under test. Pex, flex secured properly. Penetrations are sealed appropriately. Receptacles present per plan and appropriately spaced. Dwv under test. Stair clearance verified. Metallic fixture sights grounded. Fireblocking/firefoam verified. Box fills verified. Cables supported. Smoke alarms per plan.
07/09/2025 COT - RSEL - Grounding/Bonding Passed 7.9.25
Grounding and bonding verified per plan
07/21/2025 COT - RSBU - Interior Shear Bracing Passed 7-21-25: interior shear bracing approved. Okay for tape & texture.
07/25/2025 BULD - Electrical Clearance Passed 7.9.25 electrical verified per plan. Deadfront has no missing spaces. Future PV marked. Non metallic labeled at panel. Address label verified. No open knockouts. Grounding/bonding verified. Current present Breakers labeled. Number of circuits per revised plan/letter.
7/25/25: ECO
10/20/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans. Engineering is good for CofO.
10/21/2025 COT - RSEL - Electrical Final Passed Passed final 10/21/25
10/21/2025 COT - RSEL - Outdoor Lighting Passed Passed final 10/21/25
10/21/2025 COT - RSME - Mechanical Final Passed Passed final 10/21/25
10/21/2025 COT - RSPL - Plumbing Final Passed Passed final 10/21/25
10/21/2025 RSBU - Building Progress Passed Passed final 10/21/25
11/03/2025 RSBU - Building Final Passed 11.03.2025
Builder called in final, passed prior on 10.21.2025.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
SOILS REPORT_V1.PDF DOCUMENTS VIEW
Z370 ROOSEVELT TRUSS CALCS - LAYOUTS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 51 PRE SIC-2025-03-02_V1.PDF DOCUMENTS VIEW
LAE PARCEL 6 LOT 51_V1.PDF DOCUMENTS VIEW