Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
9540 E HARKES DR
Address NEW:
9540 E HARKES DR
Apply Date:
01/15/2025
Applicant:
Brianna Quiroz
Description:
SFR 500 Coolidge Model Plan La Escalera (Model master plan TC-MDP-1222-00132)

Permit Reviews

Permit Number - TC-MDP-0125-00024
Permit Status: Complete
Permit Description: SFR 500 Coolidge Model Plan La Escalera (Model master plan TC-MDP-1222-00132)
Start Date Submittal Complete Date Status  
03/06/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/19/2025 APPROVED Review Details
10/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/06/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0125-00024
Permit Status: Complete
Permit Description: SFR 500 Coolidge Model Plan La Escalera (Model master plan TC-MDP-1222-00132)
Date Description Comments
10/06/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/17/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/06/2025 Post-Tension Inspection Report is required.
01/17/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/17/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/06/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0125-00024
Permite Description: SFR 500 Coolidge Model Plan La Escalera (Model master plan TC-MDP-1222-00132)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
11/03/2025 COT - RSEL - Electrical Final N/A Re-inspection required Missing cover plate in upstairs wrong size circuit breaker on ac unit, missing label mark on air handler
11/03/2025 COT - RSME - Mechanical Final N/A Re-inspection required Missing cover plate in upstairs wrong size circuit breaker on ac unit, missing label mark on air handler
11/03/2025 RSBU - Building Final N/A Re-inspection required Missing cover plate in upstairs wrong size circuit breaker on ac unit, missing label mark on air handler

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0125-00024
Permit Description: SFR 500 Coolidge Model Plan La Escalera (Model master plan TC-MDP-1222-00132)
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/19/2025 COT - RSPL - Rough Soil Passed
05/19/2025 COT - RSPL - Sewer Passed
05/27/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
05/27/2025 COT - RSBU - Preslab Passed
05/27/2025 COT - RSEL - Electrical Underground Passed
05/27/2025 COT - RSEL - Grounding/Bonding Passed
06/26/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 6/26/25 corrections made
06/26/2025 COT - RSBU - Roof Nailing Passed 6/26/25 corrections made
08/12/2025 COT - BULD - SWG Clearance Passed
08/12/2025 COT - RSPL - Gas Pressure Test Passed 8.12.25
Pressure verified
08/12/2025 COT - RSPL - Yard Water Line Passed
08/14/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/27/2025 COT - RSBU - Interior Shear Bracing Passed
10/02/2025 BULD - Electrical Clearance Passed 10/2/25:Tep ECO CLEARANCE
11/03/2025 COT - RSEL - Outdoor Lighting Passed passed 11/3/25
11/03/2025 COT - RSPL - Plumbing Final Passed passed 11/3/25
11/03/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans. Engineering is okay for CofO.
11/03/2025 RSBU - Building Progress Passed passed 11/3/25
11/04/2025 COT - RSEL - Electrical Final Passed 11.04.2025
Approved and corrections made to prior inspection.
11/04/2025 COT - RSME - Mechanical Final Passed 11.04.2025
Approved and corrections made to prior inspection.
11/04/2025 RSBU - Building Final Passed 11.04.2025
Approved and corrections made to prior inspection same day.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 31 SIC-2025-10-03_V1.PDF DOCUMENTS VIEW
Z500 COOLIDGE- TRUSS REVIEW LETTER - LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 31 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 31 SIC-2025-03-04_V1.PDF DOCUMENTS VIEW