Status:
In Review
Type:
Model Building Permit
Address:
9508 E HARKES DR
Address NEW:
9508 E HARKES DR
Apply Date:
01/15/2025
Applicant:
Brianna Quiroz
Description:
Great Sand Dunes SFR Model Escalara (Model Master plan TC-MDP-1222-00137)

Permit Reviews

Permit Number - TC-MDP-0125-00023
Permit Status: In review
Permit Description: Great Sand Dunes SFR Model Escalara (Model Master plan TC-MDP-1222-00137)
Start Date Submittal Complete Date Status  
12/16/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 N/A IN REVIEW Review Details
11/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/25/2025 REQUIRES RESUBMIT Review Details
04/04/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/15/2025 REQUIRES RESUBMIT Review Details
04/25/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 05/01/2025 REQUIRES RESUBMIT Review Details
12/10/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/11/2025 APPROVED Review Details
05/08/2025 SITE FROM MODEL PERMIT - PRODUCTION v.3 05/12/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0125-00023
Permit Status: In review
Permit Description: Great Sand Dunes SFR Model Escalara (Model Master plan TC-MDP-1222-00137)
Date Description Comments
01/17/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
04/13/2025 Post-Installed Anchor Inspection Report is required.
04/13/2025 Post-Tension Inspection Report is required.
01/17/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/17/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
04/13/2025 Soil Compaction Special Inspection is Required.
04/13/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: In Review
Permit Number: TC-MDP-0125-00023
Permite Description: Great Sand Dunes SFR Model Escalara (Model Master plan TC-MDP-1222-00137)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
07/11/2025 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required 7-11-25: remove loose dirt from exterior footings and re-compact pad throughout.
07/11/2025 COT - RSBU - Preslab N/A Re-inspection required 7-11-25: remove loose dirt from exterior footings and re-compact pad throughout.
07/11/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 7-11-25: partial pass for UFER only.
09/26/2025 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: In Review
Permit Number: TC-MDP-0125-00023
Permit Description: Great Sand Dunes SFR Model Escalara (Model Master plan TC-MDP-1222-00137)
Total Completed Inspections - 13
Date Description Inspector Results Comments
07/07/2025 COT - RSPL - Rough Soil Passed Passed 7/7/25 ok to backfill
07/07/2025 COT - RSPL - Sewer Passed Passed 7/7/25 ok to backfill
07/07/2025 COT - RSPL - Yard Water Line Passed Passed 7/7/25 ok to backfill
07/11/2025 COT - RSEL - Electrical Underground Passed 7-11-25: electrical underground approved.
07/15/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 7/15/25 corrections made
07/15/2025 COT - RSBU - Preslab Passed 7/15/25 corrections made
07/15/2025 COT - RSEL - Grounding/Bonding Passed partial pass for ufer only
07/28/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
07/28/2025 COT - RSBU - Roof Nailing Passed
09/16/2025 BULD - Electrical Clearance Passed 9.16.25
APPROVED
PROCEED
09/16/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9.16.25
APPROVED
PROCEED
09/16/2025 COT - RSPL - Gas Pressure Test Passed 9.16.25
APPROVED
PROCEED
09/29/2025 COT - RSBU - Interior Shear Bracing Passed 9.29.25
Approved

Documents

File Name Document Type  
LOT 27 SIC-2025-11-19_V1.PDF DOCUMENTS VIEW
USE - PATTISON SOILS REPORT 1.25.2022_V1.PDF DOCUMENTS VIEW
Z470- GREAT SAND DUNES TRUSS CALCS R1 STAMPED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW